Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />Sat In Sat Out <br />Project:West Orange Site Net New Trips:1,251 1,201 <br />Location:Efland, NC Pass-By Trips:0 0 <br />Scenario:Saturday Peak Hour <br />Peak Hour:11:45 AM - 12:45 PM <br />Ct. Date 11/2/2019 <br />N/S Street:Efland-Cedar Grove Road Annual Growth Rate:2.0%Existing Year:2019 <br />E/W Street:US-70 Growth Factor:0.061208 Buildout Year:2022 <br />AM PEAK HOUR <br />AM PHF = 0.94 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 7 136 47 2 110 44 31 135 3 44 171 8 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2019 Existing Traffic 7 136 47 2 110 44 31 135 3 44 171 8 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 0 8 3 0 7 3 2 8 0 3 10 0 <br />2022 Background Traffic 7 144 50 2 117 47 33 143 3 47 181 8 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 0% <br />Inbound Project Traffic 0 0 0 0 0 0 0 0 0 0 25 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 2% 0% 0% 0% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 24 0 0 0 0 <br />Total External Site Traffic 0 0 0 0 0 0 0 24 0 0 25 0 <br />Total Project Traffic 0 0 0 0 0 0 0 24 0 0 25 0 <br />2022 Buildout Total 7 144 50 2 117 47 33 167 3 47 206 8 <br />Percent Impact (Approach) <br />5.9% <br />k:\dur_ldev\013284003 west orange site\t4 - analysis\[west orange site - saturday - tia data.xls]int. #1 4/23/20 <br />Overall Percent Impact <br />0.0%0.0%11.8%9.6% <br />Eastbound Westbound Northbound Southbound <br />US-70 US-70 Efland-Cedar Grove Road Efland-Cedar Grove Road <br />207
The URL can be used to link to this page
Your browser does not support the video tag.