Orange County NC Website
INTERSECTION ANALYSIS SHEET <br />AM In AM Out PM In PM Out <br />Project:West Orange Site Net New Trips:646 573 880 812 <br />Location:Efland, NC Pass-By Trips:0 0 0 0 <br />Scenario:Weekday Peak Hours <br />Peak Hour:7:30 - 8:30 AM; 5:00 - 6:00 PM <br />Ct. Date 5/22/2019 <br />N/S Street:US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2019 <br />E/W Street:Ben Johnston Road/Site Driveway Growth Factor:0.061208 Buildout Year:2022 <br />AM PEAK HOUR <br />AM PHF = 0.84 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 0 0 0 93 0 5 0 308 196 1 349 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2019 Existing Traffic 0 0 0 93 0 5 0 308 196 1 349 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 0 0 0 6 0 0 0 19 12 0 21 0 <br />2022 Background Traffic 0 0 0 99 0 5 0 327 208 1 370 0 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 1% 0% 52% 0% 0% 0% 0% 2% <br />Inbound Project Traffic 0 0 0 0 6 0 336 0 0 0 0 13 <br />Percent Assignment Outbound 2% 1% 48% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Outbound Project Traffic 11 6 275 0 0 0 0 0 0 0 0 0 <br />Total External Site Traffic 11 6 275 0 6 0 336 0 0 0 0 13 <br />Total Project Traffic 11 6 275 0 6 0 336 0 0 0 0 13 <br />2022 Buildout Total 11 6 275 99 6 5 336 327 208 1 370 13 <br />Percent Impact (Approach) <br />39.0% <br />PM PEAK HOUR <br />PM PHF = 0.85 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 0 0 0 151 0 0 0 331 56 3 299 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2019 Existing Traffic 0 0 0 151 0 0 0 331 56 3 299 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 0 0 0 9 0 0 0 20 3 0 18 0 <br />2022 Background Traffic 0 0 0 160 0 0 0 351 59 3 317 0 <br />Project Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 1% 0% 52% 0% 0% 0% 0% 2% <br />Inbound Project Traffic 0 0 0 0 8 0 458 0 0 0 0 18 <br />Percent Assignment Outbound 2% 1% 48% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Outbound Project Traffic 16 8 390 0 0 0 0 0 0 0 0 0 <br />Total External Site Traffic 16 8 390 0 8 0 458 0 0 0 0 18 <br />Total Project Traffic 16 8 390 0 8 0 458 0 0 0 0 18 <br />2022 Buildout Total 16 8 390 160 8 0 458 351 59 3 317 18 <br />Percent Impact (Approach) <br />50.2% <br />k:\dur_ldev\013284003 west orange site\t4 - analysis\[west orange site - weekday - tia data.xls]int. #7 4/23/20 <br />Overall Percent Impact <br />100.0%4.8%52.8%5.3% <br />Site Driveway Ben Johnston Road US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />Overall Percent Impact <br />100.0%5.5%38.6%3.4% <br />Eastbound Westbound Northbound Southbound <br />Site Driveway Ben Johnston Road US-70/I-40 Connector Road US-70/I-40 Connector Road <br />200