Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />AM In AM Out PM In PM Out <br />Project:West Orange Site Net New Trips:646 573 880 812 <br />Location:Efland, NC Pass-By Trips:0 0 0 0 <br />Scenario:Weekday Peak Hours <br />Peak Hour:7:30 - 8:30 AM; 5:00 - 6:00 PM <br />Ct. Date 5/21/2019 <br />N/S Street:US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2019 <br />E/W Street:I-40 EB Service Road Growth Factor:0.061208 Buildout Year:2022 <br />AM PEAK HOUR <br />AM PHF = 0.82 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 346 1 2 0 0 0 0 142 13 74 77 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2019 Existing Traffic 346 1 2 0 0 0 0 142 13 74 77 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 21 0 0 0 0 0 0 9 1 5 5 0 <br />2022 Background Traffic 367 1 2 0 0 0 0 151 14 79 82 0 <br />Project Traffic <br />Percent Assignment Inbound 49% 0% 0% 0% 0% 0% 0% 1% 0% 0% 0% 0% <br />Inbound Project Traffic 317 0 0 0 0 0 0 6 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 47% 1% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 269 6 0 <br />Total External Site Traffic 317 0 0 0 0 0 0 6 0 269 6 0 <br />Total Project Traffic 317 0 0 0 0 0 0 6 0 269 6 0 <br />2022 Buildout Total 684 1 2 0 0 0 0 157 14 348 88 0 <br />Percent Impact (Approach) <br />46.2% <br />PM PEAK HOUR <br />PM PHF = 0.80 <br />Description Left Through Right Left Through Right Left Through Right Left Through Right <br />2019 Traffic Count 269 0 0 0 0 0 0 52 4 26 156 0 <br />Count Balancing 0 0 0 0 0 0 0 0 0 0 0 0 <br />2019 Existing Traffic 269 0 0 0 0 0 0 52 4 26 156 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2022 Background Growth 16 0 0 0 0 0 0 3 0 2 10 0 <br />2022 Background Traffic 285 0 0 0 0 0 0 55 4 28 166 0 <br />Project Traffic <br />Percent Assignment Inbound 49% 0% 0% 0% 0% 0% 0% 1% 0% 0% 0% 0% <br />Inbound Project Traffic 431 0 0 0 0 0 0 9 0 0 0 0 <br />Percent Assignment Outbound 0% 0% 0% 0% 0% 0% 0% 0% 0% 47% 1% 0% <br />Outbound Project Traffic 0 0 0 0 0 0 0 0 0 382 8 0 <br />Total External Site Traffic 431 0 0 0 0 0 0 9 0 382 8 0 <br />Total Project Traffic 431 0 0 0 0 0 0 9 0 382 8 0 <br />2022 Buildout Total 716 0 0 0 0 0 0 64 4 410 174 0 <br />Percent Impact (Approach) <br />60.7% <br />k:\dur_ldev\013284003 west orange site\t4 - analysis\[west orange site - weekday - tia data.xls]int. #5 4/23/20 <br />Overall Percent Impact <br />60.2%-13.2%66.8% <br />I-40 EB Service Road US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />Overall Percent Impact <br />46.1%-3.5%63.1% <br />Eastbound Westbound Northbound Southbound <br />I-40 EB Service Road US-70/I-40 Connector Road US-70/I-40 Connector Road <br />198
The URL can be used to link to this page
Your browser does not support the video tag.