Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buc-ee’s – Efland, NC <br /> <br />28 <br /> <br />6.9 I-40 WB Ramp – West RI/RO Site Driveway <br /> <br />The current site plan proposes constructing a right-in/right-out (RI/RO) driveway on the I-40 WB <br />Service Road approximately 565 feet east of Mt. Willing Road. The following additional <br />improvements are recommended to accommodate projected site traffic demands: <br /> <br />• Construct the site driveway as a right-in/right-out access, with one ingress lane and one <br />egress lane <br />• Widen the I-40 WB Ramp to provide an exclusive right-turn lane with 200 feet of storage and <br />an appropriate taper. <br /> <br />With the recommended improvements in place, the minor street approach (West RI/RO Site <br />Driveway) is expected to operate with short delays in the build-out traffic condition. No queuing <br />issues are expected at this intersection. Therefore, no additional improvements are recommended <br />at this intersection to accommodate site traffic. <br /> <br />Table 6.9 summarizes the operation of the intersection for the projected (2023) build-out traffic <br />condition. <br /> <br />Table 6.9 <br />Level-of-Service <br />I-40 WB Service Road – West RI/RO Site Driveway (Unsignalized) <br />Condition AM Peak Hour <br />LOS (Delay) <br />PM Peak Hour <br />LOS (Delay) <br />Saturday Peak Hour <br />LOS (Delay) <br />Build-out (2022) Traffic* SB – A (2.1) SB – A (6.6) SB – A (2.5) <br />* Note: HCM methodology does not report an overall level of service for unsignalized intersections. The level of <br />service and delay for the worst approach (per SimTraffic) are reported above for unsignalized intersections. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />149
The URL can be used to link to this page
Your browser does not support the video tag.