Orange County NC Website
Buc-ee’s – Efland, NC <br /> <br />ES-5 <br /> <br />• Construct an exclusive westbound left-turn lane on Ben Johnston Road with 200 feet of <br />storage and an appropriate taper <br />• Restripe the existing lane on Ben Johnston Road to provide a continuous westbound shared <br />through/right-turn lane <br />• Construct dual northbound left-turn lanes with 300 feet of storage and appropriate tapers on <br />US-70/I-40 Connector <br />• Install a traffic signal. <br /> <br />I-40 WB Ramp – East RI/RO Site Driveway <br />• Construct the site driveway as a right-in/right-out access, with one ingress lane and one <br />egress lane. <br />• Remove the existing I-40 WB Exit Ramp (WB Exit 160) <br />• Widen the westbound I-40 WB Ramp to provide a continuous through lane and a continuous <br />shared through/right-turn lane on I-40 WB Service Road through this intersection, tying into <br />the existing two-lane cross section on the I-40 WB Service Road just west of the exiting WB <br />Exit 160 Ramp junction. <br /> <br />I-40 WB Ramp – West RI/RO Site Driveway <br />• Construct the site driveway as a right-in/right-out access, with one ingress lane and one <br />egress lane. <br />• Widen the I-40 WB Ramp to provide an exclusive right-turn lane with 200 feet of storage and <br />an appropriate taper. <br /> <br />The recommended roadway laneage is shown on Figure ES-1. <br />118