Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buc-ee’s – Efland, NC <br /> <br />ES-3 <br /> <br />Table ES-2 (cont.) <br />Level-of-Service Summary <br />Condition AM Peak Hour <br />LOS (Delay) <br />PM Peak Hour <br />LOS (Delay) <br />Saturday <br />Peak Hour <br />LOS (Delay) I-40 WB Service Road & East RI/RO Site Driveway (Unsignalized)* <br />Build-out (2022) Traffic SB – A (2.4) SB – A (3.3) SB – A (3.7) <br />I-40 WB Service Road &West RI/RO Site Driveway (Unsignalized)* <br />Build-out (2022) Traffic SB – A (2.1) SB – A (6.6) SB – A (2.5) <br /> * Note: HCM methodology does not report an overall level of service for unsignalized intersections. The level of <br />service and delay for the worst approach (per SimTraffic) are reported above for unsignalized intersections. <br /> <br />A weaving analysis (see Appendix) was performed for the weekday AM, PM and Saturday peak <br />hours for the projected (2022) build-out traffic condition using Highway Capacity Software (HCS <br />Version 7.8.5) to determine the operating conditions of the I-40 Service Road segments between <br />Mt. Willing Road and US-70/I-40 Connector. The peak hour weaving LOS and volume-to- <br />capacity ratio for the projected (2022) build-out condition is shown below in Table ES-3. <br /> <br /> <br />Table ES-3 <br />Weaving Level-of-Service Summary <br />Condition AM Peak Hour <br />LOS (Density) <br />PM Peak Hour <br />LOS (Density) <br />Saturday <br />Peak Hour <br />LOS (Density) <br />I-40 EB Service Road (Mt. Willing Road to US-70/I-40 Connector) <br />Build (2022) Traffic C (24.1) <br />v/c = 0.83 <br />B (14.5) <br />v/c = 0.51 <br />B (17.2) <br />v/c = 0.60 <br />I-40 WB Service Road (East RI/RO Site Driveway to Mt. Willing Road) <br />Build (2022) Traffic A (10.6) <br />v/c = 0.30 <br />B (21.3) <br />v/c = 0.63 <br />B (13.1) <br />v/c = 0.41 <br /> <br />* Note: density is measured in passenger cars per mile per lane (pc/mi/ln). <br /> <br /> <br /> <br /> <br /> <br /> <br />116
The URL can be used to link to this page
Your browser does not support the video tag.