IDTask ModeTask NameDuration StartFinishPredecessors1Buc-cee's #52 Calhoun Ga366 daysMon 6/29/20Tue 6/29/2123Release for Construction15 daysMon 6/29/20Mon 7/13/204Release1 dayMon 6/29/20Mon 6/29/205Mobillize2 wksTue 6/30/20Mon 7/13/2046Begin Grading35 daysTue 6/30/20Mon 8/3/207Install erosion control measures2 wksTue 6/30/20Mon 7/13/2048Begin clearing and grubbing3 wksTue 7/14/20Mon 8/3/2079Mass Grading112 daysTue 8/4/20Mon 11/23/2010Grading for Building Pad4 wksTue 8/4/20Mon 8/31/20811Grading for New Roadway6 wksTue 9/1/20Mon 10/12/201012Grading ponds2 wksTue 10/13/20Mon 10/26/201113Mass grading4 wksTue 10/27/20Mon 11/23/201214Fuel Storage Tanks43 daysTue 10/27/20Tue 12/8/2015Delivery1 dayTue 10/27/20Tue 10/27/201216Excavate2 wksWed 10/28/20Tue 11/10/201517Install Shoring2 wksWed 11/11/20Tue 11/24/201618Install Tanks1 wkWed 11/25/20Tue 12/1/201719Remove Shoring and Backfill1 wkWed 12/2/20Tue 12/8/201820Storm Drainage56 daysTue 11/24/20Mon 1/18/211121Install pipe8 wksTue 11/24/20Mon 1/18/211322Site Utilities by City56 daysTue 8/4/20Mon 9/28/2023Relocate existing site poles 3 wksTue 8/4/20Mon 8/24/20824Remove existing gas lines 2 wksTue 8/4/20Mon 8/17/20825Install new water lines4 wksTue 9/1/20Mon 9/28/201026Site Utilities to Building56 daysTue 10/13/20Mon 12/7/2027Sewer2 wksTue 10/13/20Mon 10/26/201128Water2 wksTue 10/27/20Mon 11/9/202729Electrical2 wksTue 11/10/20Mon 11/23/202830Gas2 wksTue 11/24/20Mon 12/7/202931Site Lighting63 daysTue 10/27/20Mon 12/28/2032Conduit3 wksTue 10/27/20Mon 11/16/201233Bases3 wksTue 11/17/20Mon 12/7/203234Set poles3 wksTue 12/8/20Mon 12/28/203335Building Construction252 daysTue 10/13/20Mon 6/21/2136Building construction duration36 wksTue 10/13/20Mon 6/21/211137Canopy Construction84 daysTue 1/19/21Mon 4/12/2138Rain leaders4 wksTue 1/19/21Mon 2/15/212139Electrical 2 wksTue 2/16/21Mon 3/1/213840Footings3 wksTue 3/2/21Mon 3/22/213941Canopy erection3 wksTue 3/23/21Mon 4/12/214042Concrete Paving63 daysTue 11/24/20Mon 1/25/2143Stone base4 wksTue 11/24/20Mon 12/21/2036SS+6 wks44Concrete paving6 wksTue 12/15/20Mon 1/25/2143SS+3 wks45Landscape154 daysTue 1/26/21Mon 6/28/2146Irrigation4 wksTue 1/26/21Mon 2/22/214447Plants4 wksTue 2/23/21Mon 3/22/214648Punch List4 wksTue 6/1/21Mon 6/28/2136SF+37 wksRelease for Construction7/13Mobillize7/13Begin Grading8/3Install erosion control measures7/13Begin clearing and grubbing8/3Mass Grading11/23Grading for Building Pad8/31Grading for New Roadway10/12Grading ponds10/26Mass grading11/23Fuel Storage Tanks12/8Delivery10/27Excavate11/10Install Shoring11/24Install Tanks12/1Remove Shoring and Backfill12/8Storm Drainage1/18Install pipe1/18Site Utilities by City9/28Relocate existing site poles 8/24Remove existing gas lines 8/17Install new water lines9/28Site Utilities to Building12/7Sewer10/26Water11/9Electrical11/23Gas12/7Site Lighting12/28Conduit11/16Bases12/7Set poles12/28Building Construction6/21Building construction duration6/21Canopy Construction4/12Rain leaders2/15Electrical 3/1Footings3/22Canopy erection4/12Concrete Paving1/25Stone base12/21Concrete paving1/25Landscape6/28Irrigation2/22Plants3/22Punch List6/2812192631017243171421285121926291623306132027411182518152229613202731017243171421287142128411182529162330613202741118Apr '20May '20Jun '20Jul '20Aug '20Sep '20Oct '20Nov '20Dec '20Jan '21Feb '21Mar '21Apr '21May '21Jun '21Jul '21TaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressBuc-ee's #52 Calhoun, GAPage 1Project: Buc-ee's #52Date: Revised 6/23/20107