Orange County NC Website
West Orange Site - Addendum #2 Phase 2 - Build Saturday - Site Drwy. Shift <br />SimTraffic Performance Report 09/15/2020 <br />Kimley-Horn Page 1 <br />5: US-70/I-40 Connector Road & I-40 EB Service Road Performance by approach <br />Approach EB NB SB All <br />Denied Del/Veh (s)0.0 0.6 0.0 0.0 <br />Total Del/Veh (s)20.5 11.9 10.4 15.8 <br />6: US-70/I-40 Connector Road & I-40 WB Service Road/I-40 WB Exit Ramp Performance by approach <br />Approach WB NB SB All <br />Denied Del/Veh (s)2.2 0.0 0.0 1.0 <br />Total Del/Veh (s)37.0 15.2 11.1 22.7 <br />7: US-70/I-40 Connector Road & Ben Johnston Road Performance by approach <br />Approach WB NB SB All <br />Denied Del/Veh (s)0.1 0.1 0.0 0.1 <br />Total Del/Veh (s)7.2 1.7 1.7 1.9 <br />11: US-70/I-40 Connector Road & Site Driveway Performance by approach <br />Approach EB NB SB All <br />Denied Del/Veh (s)0.0 0.0 0.2 0.0 <br />Total Del/Veh (s)14.1 14.9 35.0 16.8 <br />Total Zone Performance <br />Denied Del/Veh (s)1.4 <br />Total Del/Veh (s)122.8 <br />1051