Orange County NC Website
West Orange Site - Addendum #2 Phase 2 - Build PM - Site Drwy. Shift <br />SimTraffic Performance Report 09/15/2020 <br />Kimley-Horn Page 1 <br />5: US-70/I-40 Connector Road & I-40 EB Service Road Performance by approach <br />Approach EB NB SB All <br />Denied Del/Veh (s)0.0 0.3 0.0 0.0 <br />Total Del/Veh (s)26.3 27.3 8.1 18.2 <br />6: US-70/I-40 Connector Road & I-40 WB Service Road/I-40 WB Exit Ramp Performance by approach <br />Approach WB NB SB All <br />Denied Del/Veh (s)2.8 0.0 0.1 1.3 <br />Total Del/Veh (s)29.5 18.1 30.7 28.0 <br />7: US-70/I-40 Connector Road & Ben Johnston Road Performance by approach <br />Approach WB NB SB All <br />Denied Del/Veh (s)0.2 0.0 0.0 0.0 <br />Total Del/Veh (s)9.4 2.4 6.7 5.2 <br />11: US-70/I-40 Connector Road & Site Driveway Performance by approach <br />Approach EB NB SB All <br />Denied Del/Veh (s)0.0 0.0 0.2 0.0 <br />Total Del/Veh (s)14.1 15.0 31.6 18.0 <br />Total Zone Performance <br />Denied Del/Veh (s)2.0 <br />Total Del/Veh (s)331.2 <br />1049