Orange County NC Website
West Orange Site - Addendum #2 Phase 2 - Build AM - Site Drwy. Shift <br />6: US-70/I-40 Connector Road & I-40 WB Service Road/I-40 WB Exit Ramp 09/15/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T10 - Addendum 2 - Site Drwy Shift\Phase 2\Synchro\Phase2-Build AM-SiteDrwyShift.syn <br />Kimley-Horn Page 4 <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 29 (24%), Referenced to phase 2:NBTL and 6:SBTU, Start of Green <br />Natural Cycle: 40 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.67 <br />Intersection Signal Delay: 13.9 Intersection LOS: B <br />Intersection Capacity Utilization 58.4%ICU Level of Service B <br />Analysis Period (min) 15 <br />Splits and Phases: 6: US-70/I-40 Connector Road & I-40 WB Service Road/I-40 WB Exit Ramp <br />1026