Orange County NC Website
West Orange Site - Addendum #2 Phase 2 - Build AM - Site Drwy. Shift <br />5: US-70/I-40 Connector Road & I-40 EB Service Road 09/15/2020 <br />K:\DUR_LDEV\013284003 West Orange Site\T10 - Addendum 2 - Site Drwy Shift\Phase 2\Synchro\Phase2-Build AM-SiteDrwyShift.syn <br />Kimley-Horn Page 2 <br />Cycle Length: 120 <br />Actuated Cycle Length: 120 <br />Offset: 41 (34%), Referenced to phase 2:NBT and 6:SBTL, Start of Green <br />Natural Cycle: 50 <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.70 <br />Intersection Signal Delay: 28.7 Intersection LOS: C <br />Intersection Capacity Utilization 58.4%ICU Level of Service B <br />Analysis Period (min) 15 <br />Splits and Phases: 5: US-70/I-40 Connector Road & I-40 EB Service Road <br />1024