Orange County NC Website
INTERSECTION ANALYSIS SHEET <br />Sat In Sat Out <br />Project:Buc-ee's Net New Trips:90 73 <br />Location:Efland, NC Pass-By Trips:75 68 <br />Scenario:Addendum #2 - Saturday Peak Hour <br />Peak Hour:11:00 AM - 12:00 PM <br />Ct. Date 10/26/2019 <br />N/S Street:US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2020 <br />E/W Street:Site Driveway Growth Factor:0.061208 Buildout Year:2023 <br />SAT PEAK HOUR <br />AM PHF = 0.90 <br />Description Left Through Right Left Through Right U-Turn Left Through Right Left Through Right <br />2020 Traffic Count 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Count Balancing 0 0 0 0 0 0 0 0 171 0 0 173 0 <br />2020 Existing Traffic 0 0 0 0 0 0 0 0 171 0 0 173 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 0 0 0 0 0 0 0 0 10 0 0 11 0 <br />2023 Background Traffic 0 0 0 0 0 0 0 0 181 0 0 184 0 <br />Project Traffic <br />Buc-ee's Phase 1 Traffic 26 0 647 0 0 0 0 385 0 0 0 0 27 <br />Phase 2 Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 0% 45% 0% 0% 0% 0% 5% <br />Inbound Project Traffic 0 0 0 0 0 0 0 41 0 0 0 0 4 <br />Percent Assignment Outbound 5% 0% 45% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Outbound Project Traffic 4 0 33 0 0 0 0 0 0 0 0 0 0 <br />Total External Site Traffic 4 0 33 0 0 0 0 41 0 0 0 0 4 <br />Pass-By Capture Reduction 0 0 0 0 0 0 0 0 -4 0 0 -4 0 <br />Pass-By Capture Assignment 3 0 34 0 0 0 0 38 0 0 0 0 4 <br />Total Pass-By Traffic 3 0 34 0 0 0 0 38 -4 0 0 -4 4 <br />Total Phase 2 Traffic 7 0 67 0 0 0 0 79 -4 0 0 -4 8 <br />Total Project Traffic 33 0 714 0 0 0 0 464 -4 0 0 -4 35 <br />Ben Johnston RI/RO Diversion 0 0 0 0 0 0 60 0 0 0 0 0 0 <br />2023 Buildout Total 33 0 714 0 0 0 60 464 177 0 0 180 35 <br />Percent Impact (Approach) <br />74.4% <br />k:\dur_ldev\013284003 west orange site\t10 - addendum 2 - site drwy shift\phase 2\[phase2-sitedrwyshift-west orange site - saturday - tia data.xls]int. #11 9/14/20 <br />Overall Percent Impact <br />100.0%-65.6%14.4% <br />Eastbound Westbound Northbound Southbound <br />Site Driveway US-70/I-40 Connector Road US-70/I-40 Connector Road <br />1021