Browse
Search
Planning Board - 110420 Attachment 1
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Attachment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:49:09 AM
Creation date
10/29/2020 10:32:12 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1075
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION ANALYSIS SHEET <br />AM In AM Out PM In PM Out <br />Project:Buc-ee's Phase 2 Net New Trips:152 45 106 113 <br />Location:Efland NC Pass-By Trips:4 3 52 39 <br />Scenario:Addendum #2 - Weekday Peak <br />Peak Hour:7:30 - 8:30 AM; 5:00 - 6:00 PM <br />Ct. Date 5/22/2019 <br />N/S Street:US-70/I-40 Connector Road Annual Growth Rate:2.0%Existing Year:2020 <br />E/W Street:Site Driveway Growth Factor:0.061208 Buildout Year:2023 <br />AM PEAK HOUR <br />AM PHF = 0.90 <br />Description Left Through Right Left Through Right U-Turn Left Through Right Left Through Right <br />2020 Traffic Count 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Count Balancing 0 0 0 0 0 0 0 0 313 0 0 350 0 <br />2020 Existing Traffic 0 0 0 0 0 0 0 0 313 0 0 350 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 0 0 0 0 0 0 0 0 19 0 0 21 0 <br />2023 Background Traffic 0 0 0 0 0 0 0 0 332 0 0 371 0 <br />Project Traffic <br />Buc-ee's Phase 1 Traffic 13 0 309 0 0 0 0 199 0 0 0 0 14 <br />Phase 2 Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 0% 45% 0% 0% 0% 0% 5% <br />Inbound Project Traffic 0 0 0 0 0 0 0 68 0 0 0 0 8 <br />Percent Assignment Outbound 5% 0% 45% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Outbound Project Traffic 2 0 20 0 0 0 0 0 0 0 0 0 0 <br />Total External Site Traffic 2 0 20 0 0 0 0 68 0 0 0 0 8 <br />Pass-By Capture Reduction 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Pass-By Capture Assignment 0 0 2 0 0 0 0 2 0 0 0 0 0 <br />Total Pass-By Traffic 0 0 2 0 0 0 0 2 0 0 0 0 0 <br />Total Phase 2 Traffic 2 0 22 0 0 0 0 70 0 0 0 0 8 <br />Total Project Traffic 15 0 331 0 0 0 0 269 0 0 0 0 22 <br />Ben Johnston RI/RO Diversion 0 0 0 0 0 0 99 0 0 0 0 0 0 <br />2023 Buildout Total 15 0 331 0 0 0 99 269 332 0 0 371 22 <br />Percent Impact (Approach) <br />44.3% <br />PM PEAK HOUR <br />PM PHF = 0.90 <br />Description Left Through Right Left Through Right U-Turn Left Through Right Left Through Right <br />2020 Traffic Count 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Count Balancing 0 0 0 0 0 0 0 0 331 0 0 302 0 <br />2020 Existing Traffic 0 0 0 0 0 0 0 0 331 0 0 302 0 <br />Growth Factor (0.02 per year)0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 0.061 <br />2023 Background Growth 0 0 0 0 0 0 0 0 20 0 0 18 0 <br />2023 Background Traffic 0 0 0 0 0 0 0 0 351 0 0 320 0 <br />Project Traffic <br />Buc-ee's Phase 1 Traffic 18 0 438 0 0 0 0 270 0 0 0 0 19 <br />Phase 2 Traffic <br />Percent Assignment Inbound 0% 0% 0% 0% 0% 0% 0% 45% 0% 0% 0% 0% 5% <br />Inbound Project Traffic 0 0 0 0 0 0 0 47 0 0 0 0 5 <br />Percent Assignment Outbound 5% 0% 45% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% <br />Outbound Project Traffic 6 0 51 0 0 0 0 0 0 0 0 0 0 <br />Total External Site Traffic 6 0 51 0 0 0 0 47 0 0 0 0 5 <br />Pass-By Capture Reduction 0 0 0 0 0 0 0 0 -3 0 0 -3 0 <br />Pass-By Capture Assignment 2 0 20 0 0 0 0 26 0 0 0 0 3 <br />Total Pass-By Traffic 2 0 20 0 0 0 0 26 -3 0 0 -3 3 <br />Total Phase 2 Traffic 8 0 71 0 0 0 0 73 -3 0 0 -3 8 <br />Total Project Traffic 26 0 509 0 0 0 0 343 -3 0 0 -3 27 <br />Ben Johnston RI/RO Diversion 0 0 0 0 0 0 160 0 0 0 0 0 0 <br />2023 Buildout Total 26 0 509 0 0 0 160 343 348 0 0 317 27 <br />Percent Impact (Approach) <br />52.0% <br />k:\dur_ldev\013284003 west orange site\t10 - addendum 2 - site drwy shift\phase 2\[phase2-sitedrwyshift-west orange site - weekday - tia data.xls]int. #11 9/14/20 <br />Site Driveway US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />100.0%-38.4%5.6% <br />Overall Percent Impact <br />Site Driveway US-70/I-40 Connector Road US-70/I-40 Connector Road <br />Eastbound Westbound Northbound Southbound <br />100.0%-40.0%7.0% <br />Overall Percent Impact <br />1017
The URL can be used to link to this page
Your browser does not support the video tag.