Orange County NC Website
West Orange Site - Addendum #2 Phase 1 - Build Saturday - Site Drwy. Shift <br />SimTraffic Performance Report 09/14/2020 <br />Kimley-Horn Page 1 <br />5: US-70/I-40 Connector Road & I-40 EB Service Road Performance by movement <br />Movement EBL EBT EBR NBT NBR SBL SBT All <br />Denied Del/Veh (s)0.0 0.0 0.0 0.2 4.0 0.0 0.0 0.0 <br />Total Del/Veh (s)69.9 77.7 69.9 12.9 2.0 23.3 10.8 47.8 <br />6: US-70/I-40 Connector Road & I-40 WB Service Road/I-40 WB Exit Ramp Performance by movement <br />Movement WBL WBT WBR NBL NBT SBU SBT SBR All <br />Denied Del/Veh (s)3.1 1.4 3.2 0.0 0.0 0.0 0.0 0.0 0.7 <br />Total Del/Veh (s)23.3 47.3 24.0 160.0 26.1 36.1 27.2 3.2 42.2 <br />7: US-70/I-40 Connector Road & Ben Johnston Road Performance by movement <br />Movement WBR NBT NBR SBT All <br />Denied Del/Veh (s)0.1 0.0 0.0 0.0 0.0 <br />Total Del/Veh (s)11.2 2.0 0.9 5.3 3.9 <br />11: US-70/I-40 Connector Road & Site Driveway Performance by movement <br />Movement EBL EBR NBU NBL NBT SBT SBR All <br />Denied Del/Veh (s)0.0 0.0 0.0 0.0 0.0 0.2 0.2 0.0 <br />Total Del/Veh (s)47.6 15.1 16.2 17.9 4.0 54.4 22.3 19.6 <br />Total Zone Performance <br />Denied Del/Veh (s)1.6 <br />Total Del/Veh (s)2622.1 <br />1003