Orange County NC Website
West Orange Site - Addendum #2 Phase 1 - Build PM - Site Drwy. Shift <br />SimTraffic Performance Report 09/14/2020 <br />Kimley-Horn Page 1 <br />5: US-70/I-40 Connector Road & I-40 EB Service Road Performance by approach <br />Approach EB NB SB All <br />Denied Del/Veh (s)0.0 0.3 0.0 0.0 <br />Total Del/Veh (s)42.5 11.1 17.3 30.4 <br />6: US-70/I-40 Connector Road & I-40 WB Service Road/I-40 WB Exit Ramp Performance by approach <br />Approach WB NB SB All <br />Denied Del/Veh (s)2.3 0.0 0.2 1.0 <br />Total Del/Veh (s)39.4 26.4 26.4 31.9 <br />7: US-70/I-40 Connector Road & Ben Johnston Road Performance by approach <br />Approach WB NB SB All <br />Denied Del/Veh (s)0.2 0.0 0.0 0.0 <br />Total Del/Veh (s)11.7 1.9 4.7 4.0 <br />11: US-70/I-40 Connector Road & Site Driveway Performance by approach <br />Approach EB NB SB All <br />Denied Del/Veh (s)0.0 0.0 0.2 0.0 <br />Total Del/Veh (s)12.4 14.7 28.5 16.6 <br />Total Zone Performance <br />Denied Del/Veh (s)1.7 <br />Total Del/Veh (s)1775.0 <br />1001