Browse
Search
Agenda - 10-20-20; 6-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 10-20-20 Virtual Business Meeting
>
Agenda - 10-20-20; 6-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 4:38:53 PM
Creation date
10/15/2020 4:50:45 PM
Metadata
Fields
Template:
BOCC
Date
10/20/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Minutes 10-20-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
ORD-2020-022 Ordinance Amending The Orange County Zoning Atlas
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2020
OTHER-2020-010 Statement of Consistency of A Proposed Unified Development Ordinance Map Amendment w-Adopted Orange County 2030 Comprehensive Plan - Applicant initiated Amendment rezone 3 parcels
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. The Orange County and Town of Hillsborough Fire Marshal, in consultation <br />with the Town of Hillsborough Utility Director, shall review and approve <br />location(s) of proposed water lines prior to the initiation of land disturbing <br />activity. Sizing of said lines shall be based on the proposed development, <br />including water flow test data. <br /> <br />VIII OTHER: 40 <br />a. No permanent fuel or chemical storage shall occur within 30 ft. of a <br />floodplain/stream buffer established consistent with the provisions of <br />Section 6.13 of the County UDO. <br />b. A minimum of 2 electrical vehicle charging stations shall be installed for <br />every building constructed on-site. Additional stations may be proposed as <br />part of the site plan review process. <br />c. Vehicles within the Project shall be prohibited from idling for more than five <br />(5) consecutive minutes. This shall include any device or combination of <br />devices meeting all of the following criteria: <br />i. Designed with a gross vehicle weight rating of more than 14,000 <br />pounds; and <br />ii. Required under North Carolina law to be registered; and <br />iii. Designed to operate on public highways; and <br />b.iv. Powered by a diesel engine. 41 <br /> <br />This restriction shall not apply when: <br />1. A vehicle is forced to remain motionless because of <br />traffic or adverse weather conditions affecting the safe <br />operation of the vehicle; <br />2. A vehicle is being operated for emergency or law <br />enforcement purposes; <br />3. The primary propulsion engine of a vehicle meets all of <br />the following criteria: <br />a. Is providing a power source necessary for <br />mechanical operations other than propulsion; and; <br /> <br />40 These 2 conditions were added to address Planning Board comments from the August 5 and 19, 2020 meeting. <br />The applicant agreed to the imposition of these conditions. <br />41 Idling condition as recommended by the applicant. Staff would recommend prohibiting any/all vehicles from <br />idling for more than 1 consecutive minute. <br />32
The URL can be used to link to this page
Your browser does not support the video tag.