Browse
Search
Agenda - 10-20-20; 6-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 10-20-20 Virtual Business Meeting
>
Agenda - 10-20-20; 6-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 4:38:53 PM
Creation date
10/15/2020 4:50:45 PM
Metadata
Fields
Template:
BOCC
Date
10/20/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Minutes 10-20-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
ORD-2020-022 Ordinance Amending The Orange County Zoning Atlas
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2020
OTHER-2020-010 Statement of Consistency of A Proposed Unified Development Ordinance Map Amendment w-Adopted Orange County 2030 Comprehensive Plan - Applicant initiated Amendment rezone 3 parcels
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. Parking lot design and layout shall be in accordance with Section 6.9 <br />of the UDO; 36 <br />ii.i. 1 space shall be required for every 750 sq.ft. of office space; <br />iii.ii. 1 space per 3,000 sq.ft. of additional indoor area (exclusive of office <br />area). 37 <br />f. Signage: In addition to the standards contained in Section 6.12 of the UDO, <br />the following specific standards shall apply to the Project: <br />i. Signs shall be permitted consistent with the approved sign master <br />plan for the project; <br />ii. Final location/size shall be reviewed/approved by staff as part of a <br />site plan submitted in accordance with Section 2.5 of the UDO and <br />the conditions contained herein. <br />g. Lighting: In addition to the standards contained in Section 6.11 of the <br />UDO, the following specific standards shall apply to the Project: <br />i. Lighting plans shall be prepared in accordance with Section 6.11 of <br />the UDO; 38 <br />ii. All lighting shall be full-cut off fixtures; <br />iii. Lighting in parking areas shall observe a height limit of 45 ft.; <br />iv. All lighting shall comply with maximum foot-candle limits at property <br />lines as noted in Section 6.11.6.A of the UDO; <br />v. Lighting within the Project shall abide by the standards detailed in <br />Section 6.11.8 of the UDO. 39 <br />h. Stream Buffers: The Project shall comply with the provisions of Section <br />6.13 of the UDO. <br />i. Stormwater regulations: The Project shall comply with the provisions of <br />Section 6.14 of the UDO. <br />j. Erosion Control regulations. The Project shall comply with the provisions <br />of Section 6.15 of the UDO. <br />k. Flood regulations: The Project shall comply with the provisions of Section <br />6.21 of the UDO. <br /> <br />VI. PERMITTED AND PROHIBITED LAND USES: <br /> <br />36 Yellow highlighted language makes this condition unnecessary. <br />37 Staff had identified concern(s) proposed parking was insufficient to address the overall parking needs for the <br />project. At its October 6, 2020 regular meeting, the BOCC agreed to impose the condition recommended by the <br />applicant and denoted with yellow highlighting. <br />38 Yellow highlighted language makes this condition unnecessary. <br />39 Ibid. <br />27
The URL can be used to link to this page
Your browser does not support the video tag.