Browse
Search
Agenda - 10-20-20; 6-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 10-20-20 Virtual Business Meeting
>
Agenda - 10-20-20; 6-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 4:38:53 PM
Creation date
10/15/2020 4:12:49 PM
Metadata
Fields
Template:
BOCC
Date
10/20/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vii. Expansions to an existing buildings shall provide for continuity <br />between the existing building and the proposed addition. The <br />addition need not strictly match the existing building, but shall include <br />prominent design elements of the old building to provide architectural <br />compatibility between old and new. <br />STAFF COMMENT: It is unclear how this condition will be <br />enforced. Staff is concerned over the lack of measurable <br />standard. <br />viii. Building design/construction shall not preclude incorporation of <br />alternative energy systems such as solar panels. 24 <br />ix. Equipment (i.e. HVAC, elevator overrides, etc.) shall be screened <br />utilizing 1 of the following methods: <br />1. Clad in exterior materials that are non-reflective or illuminated, <br />OR <br />2. Designed as an architectural feature of the proposed <br />structure, OR <br />3. Screened through some vegetative buffer or fencing.25 <br />x. All buildings constructed within the Project shall utilize <br />equipment/appliances/etc. be energy star rated shall be Energy <br />Star certified at the time of construction (or in the <br />discontinuance of such certification, substantially in <br />compliance with the former certification requirements) and, after <br />issuance of a certificate of compliance (CoC), all installed systems <br />shall receive proper maintenance in the ordinance course of <br />businesses; 26 <br />xi. Development within the Project shall substantially utilize LED <br />lighting for interior and exterior lights, or future successor <br />technology, except in areas where use of same could typically be <br />prohibited (i.e. lab space, etc.); 27 <br />xii. Development within the Project shall utilize rain reclamation devices <br />collecting rainwater for irrigation purposes;28 <br /> <br />24 Condition added to address Planning Board concern(s) identified during the August 5 and 19, 2020 regular <br />meeting. The applicant agreed during the meeting to the proposed language. <br />25 Yellow highlighted text denotes a modification, suggested by staff, approved by the BOCC at its October 6, 2020 <br />meeting <br />26 Bold Green Text denotes suggested amendments provided by the applicant with a staff modification. <br />27 Bold Green Text denotes suggested amendments provided by the applicant on October 1, 2020 after the agenda <br />packet had been distributed. Staff has added language addressing these instances where LED lights may not be <br />required as a means of eliminating the word ‘substantially’. <br />28 Yellow highlighted text denotes a condition recommended by the applicant, and approved by the BOCC at its <br />October 6, 2020 regular meeting. <br />23
The URL can be used to link to this page
Your browser does not support the video tag.