Browse
Search
Agenda - 09-04-2001-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 09-04-2001
>
Agenda - 09-04-2001-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:10:26 PM
Creation date
8/29/2008 10:34:15 AM
Metadata
Fields
Template:
BOCC
Date
9/4/2001
Document Type
Agenda
Agenda Item
9a
Document Relationships
2001 NS Purchasing - Reece, Noland, McElrath Award of Bid, Contract Approval for Whitted HVAC Consulting Engineer
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
Minutes - 09-04-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
litigatioA, then all of our costs associated with collection are recoverable- if paymems are <br />withheld or disputed, we resin th+e rigtrt to stop work until account is current. Tf there is a project <br />sign and building plagt<e, Reece, Noland & McElrath Engineers wi11 be appropriately Natal. <br />T3a^:aarecrrt prcperasios anQ dietribt.»~ Sar biaair~, as well as ~~ ~p~g reg3:e by <br />Owner, will ba treated as rcimbu~sables. <br />~'he basic HVA/C system proposed is viable sir volurue (VAY) with tennis! reheat, air <br />coaled water chiller, and natural gas bailers, as recommended by the Robson & Waese, lnc. <br />Study. EnhancementJxnodificatintts to this basic aystetQ will be emt9dc9red as budget supports, for <br />improved envirot~tal susta~ability, comfort, and indoor air quality. Passibilitlcs i;aalude boat <br />recovery, water cooled chiller with hydmrric economizer, variable speed pumping, dersnand control <br />ventilation, and increased efficiency boilers. <br />Electrical connax:tions to new HVaiC equipment will bd deaiated based otr being supplied <br />from e~stir+g building service. New building lightiTMg systems will be specified if ca2ittga are <br />removed, winch i$ expected, Ne;w iigl~t fxture3 vrill typically be T-8 flttarescent 5xtunes with <br />eleetrozaic ballasts, with aorae HTD fixtures in the Ia~rary. This should improve the cnetgy <br />efficiency of the facility sigaif~caatly, im addition to reducing the cooling load. <br />New Iay.m ceilings and new suspension systems will most likely be specified, as <br />expcctationa are that mecF~arsical work in the above ceiling cavities will rcquirE a1'nost complete <br />removal of existirsg ceilings. - <br />We have included zzo aefvices related to identification or removal oFhazardous wastes <br />(asbestos. lead based paint, etc.) from the facility, as our understanding is that the buildings have <br />bey inspected snd na each materials have been idantif~ed. If such materials are encountered <br />during construction, it will be the reeponaibiiity of the Owner to have wch materials remeved. <br />Ifyou have any geustions or your needs differ from the scope of wank i have assumed acid <br />quoted above, please let tree know. <br />Yours very truly, <br />ILEECE, NOLAND & MaEI_RATH, INC. <br />~ C~ <br />Stephen C. Kaufrnari, P.E. <br />Accepted 23y: ~~ _ <br />Date; <br />
The URL can be used to link to this page
Your browser does not support the video tag.