Browse
Search
Agenda - 09-04-2001-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 09-04-2001
>
Agenda - 09-04-2001-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:10:26 PM
Creation date
8/29/2008 10:34:15 AM
Metadata
Fields
Template:
BOCC
Date
9/4/2001
Document Type
Agenda
Agenda Item
9a
Document Relationships
2001 NS Purchasing - Reece, Noland, McElrath Award of Bid, Contract Approval for Whitted HVAC Consulting Engineer
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
Minutes - 09-04-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />DATE: 08/29/01 <br />TO: John Link; County Manager <br />FROM: Wilbert McAdoo; Public Works Director <br />RE: Prioritization of Repair and, Improvement Items for Richard E. Whiffed Human <br />Services Center and Central Recreation Buildin <br />Following recent discussions with yourself and various other County staff, we have developed <br />the following list of projects and tasks for completion based on identified priorities. Although <br />some tasks obviously rank lower on a priority basis, all have been previously identified for <br />completion either as part of the CIP or Facilities Improvements process. All need to be <br />completed in a timely manner. Although HVAC replacement is identified as the highest priority <br />need, it is recommended that other items be completed in order as soon as funds can be <br />identified and bids can be received for completion of the work. <br />Richard E. Whitted Human Services Center <br />1 Re lace HVAC s stem 80 weeks <br />2 Re lace floorin in critical areas as identified 8 weeks <br />2a Replace remaining flooring (recommend completion <br />concurrent with HVAC installation <br />26 weeks <br />3 Paint areas concurrent with critical floorin 8 weeks <br />3a Paint areas concurrent with HVAC re lacement 26 weeks <br />4 Pave arkin lots east and southwest 20 weeks <br />5 Retrofit restrooms floors, walls, fixtures 16 weeks <br />6 Landscaping improvements (including parking lot <br />cleanu /re lantin <br />4 weeks <br />7 Point u stone stairs/walkwa 4 weeks <br />8 Re air retainin walls 8 weeks <br />9 Complete foundation wall waterproofing <br />8 weeks <br />10 Sidewalk re airs 8 weeks <br />11 Address needs of trees south and east sides 8 weeks <br />12 Su I /install blinds in connectin corridors 4 weeks <br />13 Su I /install window screens 8 weeks <br />TOTAL Estimate <br />$3.3 million <br />
The URL can be used to link to this page
Your browser does not support the video tag.