Orange County NC Website
4 <br />DATE: 08/29/01 <br />TO: John Link; County Manager <br />FROM: Wilbert McAdoo; Public Works Director <br />RE: Prioritization of Repair and, Improvement Items for Richard E. Whiffed Human <br />Services Center and Central Recreation Buildin <br />Following recent discussions with yourself and various other County staff, we have developed <br />the following list of projects and tasks for completion based on identified priorities. Although <br />some tasks obviously rank lower on a priority basis, all have been previously identified for <br />completion either as part of the CIP or Facilities Improvements process. All need to be <br />completed in a timely manner. Although HVAC replacement is identified as the highest priority <br />need, it is recommended that other items be completed in order as soon as funds can be <br />identified and bids can be received for completion of the work. <br />Richard E. Whitted Human Services Center <br />1 Re lace HVAC s stem 80 weeks <br />2 Re lace floorin in critical areas as identified 8 weeks <br />2a Replace remaining flooring (recommend completion <br />concurrent with HVAC installation <br />26 weeks <br />3 Paint areas concurrent with critical floorin 8 weeks <br />3a Paint areas concurrent with HVAC re lacement 26 weeks <br />4 Pave arkin lots east and southwest 20 weeks <br />5 Retrofit restrooms floors, walls, fixtures 16 weeks <br />6 Landscaping improvements (including parking lot <br />cleanu /re lantin <br />4 weeks <br />7 Point u stone stairs/walkwa 4 weeks <br />8 Re air retainin walls 8 weeks <br />9 Complete foundation wall waterproofing <br />8 weeks <br />10 Sidewalk re airs 8 weeks <br />11 Address needs of trees south and east sides 8 weeks <br />12 Su I /install blinds in connectin corridors 4 weeks <br />13 Su I /install window screens 8 weeks <br />TOTAL Estimate <br />$3.3 million <br />