Browse
Search
IPWG notes 040815
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Intergovernmental Parks Work Group
>
Meeting notes
>
2015
>
IPWG notes 040815
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 3:25:27 PM
Creation date
10/15/2020 3:20:05 PM
Metadata
Fields
Template:
BOCC
Date
4/8/2015
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
Intergovernmental Parks WG 040815
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Intergovernmental Parks Work Group\Agendas\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agenda Items / Notes (April 8, 2015) <br /> 1. Call to order <br /> Chair Rich called the meeting to order at 5:35 PM <br /> 2. Introductions <br /> Introduction of members and staff <br /> 3. Update: Cedar Falls Artificial Turf Performance-Jim Orr- Director of Chapel Hill Parks and Recreation <br /> Jim read from a memo to the Chapel Hill Town Manager outlining the first year of the artificial fields at Cedar falls Park <br /> March 23,2015 <br /> To: Roger Stancil,Manager <br /> From: Jim Orr,Parks and Recreation Director <br /> Subject: Cedar Falls Parks—First year of Artificial Turf <br /> On December 20,2013,the new artificial turf fields at Cedar Falls Park were dedicated and opened for play.This project was a partnership between Orange County and <br /> the Town of Chapel Hill.As you can imagine,over the past year,the fields have received a tremendous amount of play and have become a popular venue of choice for <br /> local organizations as well as for informal"pick-up"games. <br /> In this memo I will try to provide you a brief summary as to the extent of the successes that we have seen over this last year. <br /> The time period that this analysis covers is from December 21,2013 through December 20,2014: <br /> • 67,200 additional participants using the fields that were not using our fields at the same time the previous year. This information was gathered through our <br /> RECTRAC reservation system. All groups are required to reserve these fields through this system. It captures organization name/address and number of <br /> participants for every reserved time slot. This number does not take into consideration the Friday evenings from 4pm to lOpm and Sundays up until 4pm <br /> that can't be reserved and is for open play on a first come first serve basis.We are estimating that an additional 7,500 people used the fields during those <br /> hours through this time period. That brings the total usage to 74,700 participants.The hours that the fields are available for rental is M-Th.and Sat.from <br /> lam to l0pm;Fridays from lam to 4pm;Sundays from 4pm to dark.Open play is scheduled for Fridays from 4pm to l Opm and Sundays from 7am to 4pm. <br /> If a field is not rented it can be used by any group or individuals on a first come first served basis at no charge. <br /> • Revenue that was received during this time period was$80,000. This was tracked through the RECTRAC software system from organizations and <br /> individuals. <br /> • The overall expenses for the fields were in 2 categories:(1)Materials,such as paint for lining fields for Rugby and Field Hockey since they couldn't use the <br /> permanent lines=$237.50 and(2)Labor;103 man hours and an average hourly wage of$17.19=$1,770.57. Total for labor and materials was$2,008.07. <br /> • During the first year,the net revenue was$78,000. <br /> • One expense item that will have to be budgeted for every 2 to 3 years will be an overall re-top dressing of the fields with the rubber infill. The timing will be <br /> determined by overall amount of play and how much the existing infill may have shifted over time. The expense for the top dressing is approximately <br /> $10,000 conservatively. <br /> • Each year we can expect a slight increase in revenue based on increase in participation and we can expect the same level of expense($10,000 more for the <br /> year the fields are top dressed. <br /> By the information that has been gathered for the first year of operation of the artificial turf fields,it seems reasonable to say that the project has been successful and <br /> was the"right"thing to do,based on the tremendous amount of field requests that the department had been receiving. The project took a non-revenue producing field <br /> and turned it into the most popular athletic complex the Town has as well as producing a net profit of$78,000 per year. <br /> Discussion followed: <br /> 1. How was attendance determined? Answer: Staff estimates it from snap shots taken every hour. <br /> 2. Funding came from? Answer: Chapel Hill and Orange County <br /> 3. When will it pay for itself? Answer: Less than ten years <br /> 4. Warranty? Answer: Eight years <br /> 5. Cost? Answer: $1,200,000 total (infrastructure plus fields); Fields $500,000-600,000 <br /> 6. Cost to rent? Answer: $45 an hour w/ lights $35 without <br /> 7. Any complaints about using artificial? Answer: Not yet; one comment it was too cushy <br /> 4. Presentation: UNC Recreation Master Plan & Colligate Recreation <br /> Bill Goa—Director of Campus Recreation at UNC <br /> Bill replaced Marty Pomerantz; Prior - worked for 28 years at Nebraska <br /> • UNC hired HOK to do a new Recreation Master Plan <br /> • 3 Areas of concentration: <br /> • Indoor <br /> • Outdoor <br /> 0 Carolina Outdoor Education Center <br />
The URL can be used to link to this page
Your browser does not support the video tag.