Browse
Search
BOH Agenda 032520
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Board of Health
>
Agendas
>
2020
>
BOH Agenda 032520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2020 1:48:27 PM
Creation date
10/5/2020 11:17:59 AM
Metadata
Fields
Template:
BOCC
Date
3/25/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOH Minutes of 032520
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Board of Health\Minutes\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
measuring point prior to starting the pump; <br /> c. Measure and record the discharge rate at intervals of 10 minutes or <br /> less; <br /> d. Measure and record water levels using a steel or electric tape at <br /> intervals of 10 minutes or less; <br /> e. Continue the test for a period of at least one hour, and <br /> f. Make measurements within an accuracy of plus or minus one inch. <br /> 2. Air Rotary Drill Method <br /> a. Measure and record the amount of water being injected into the well <br /> during drilling operations; <br /> b. Measure and record the discharge rate in gallons per minute at <br /> intervals of one hour or less during drilling operations; <br /> c. After completion of the drilling, continue to blow the water out of the <br /> well for at least 30 minutes, and measure and record the discharge rate <br /> in gallons per minute at intervals of 10 minutes or less during the <br /> period, and <br /> d. Measure and record the water level immediately after discharge ceases. <br /> 3. Air Lift Method <br /> a. Measurements shall be made through a pipe placed in the well. The <br /> pipe shall have a minimum inside diameter of at least five-tenths of an <br /> inch and shall extend from top of the well head to a point inside the <br /> well that is below the bottom of the airline. <br /> b. Measure and record the static water level prior to starting the air <br /> compressor; <br /> c. Measure and record the discharge rate at intervals of 10 minutes or <br /> less; <br /> d. Measure and record the pumping level using a steel or electric tape at <br /> intervals of 10 minutes or less, and; <br /> e. Continue the test for a period of at least one hour. <br /> History Note: Substitute for NCAC 02C.0110 <br /> Eff. July 1, 2008; amended eff. October 23, 2009 <br /> Q. DISINFECTION OF WATER SUPPLY WELLS <br /> 1. Any person constructing, repairing, testing, performing maintenance, or <br /> installing a pump in a water supply well shall disinfect the well upon <br /> completion of construction, repairs, testing, maintenance, or pump <br /> installation. <br /> 2. Any person disinfecting a well shall perform disinfection in accordance with <br /> the following procedures: <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.