Browse
Search
BOH Agenda 022620
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Board of Health
>
Agendas
>
2020
>
BOH Agenda 022620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2020 1:35:02 PM
Creation date
10/5/2020 11:16:52 AM
Metadata
Fields
Template:
BOCC
Date
2/26/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOH Minutes of 022620
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Board of Health\Minutes\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comment[VH66]:NEW STATE SECTION <br /> 11.Any materials containing(lead shall meet NSF 61 standardsl. Joints of any suction 02C.010e <br /> line installed underground between the well and pump shall be water-tight under <br /> system pressure. <br /> History Note: Substitute for NCAC 02C.0109 <br /> Eff. July 1, 2008;Amended eff. November 21, 2008;October 23, 2009;March 25, 2020 <br /> P. WELL TESTS FOR YIELD- Every water supply well shall be tested for capacity by one <br /> of the following methods: <br /> 1. Pump Method <br /> a)Select a permanent measuring point,such as the top of the casing; <br /> b) Measure and record the static water level below or above the measuring point <br /> prior to starting the pump; <br /> c) Measure and record the discharge rate at intervals of 10 minutes or less; <br /> d) Measure and record water levels using a steel or electric tape at intervals of 10 <br /> minutes or less; <br /> e)Continue the test for a period of one hour or longer{,and Comment[VH67]:STATE VERBIAGE"AT LEAST <br /> ONE HOUR" <br /> f) Make measurements within an accuracy of plus or minus one inch. <br /> 2.Air Rotary Drill Method <br /> a) Measure and record the amount of water being injected into the well during <br /> drilling operations; <br /> b) Measure and record the discharge rate in gallons per minute at intervals of <br /> one hour or less during drilling operations; <br /> c)After completion of the drilling, continue to blow the water out of the well for at <br /> least 30 minutes and measure and record the discharge rate in gallons per <br /> minute at intervals of 10 minutes or less during the period, and; <br /> d) Measure and record the water level immediately after discharge ceases. <br /> 3.Air Lift Method <br /> a) Measurements shall be made through a pipe placed in the well. The pipe shall <br /> have a minimum inside diameter of at least five tenths of an inch and shall extend <br /> from top of the well head to a point inside the well that is below the bottom of the <br /> airline. <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.