Browse
Search
BOH Agenda 022620
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Board of Health
>
Agendas
>
2020
>
BOH Agenda 022620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2020 1:35:02 PM
Creation date
10/5/2020 11:16:52 AM
Metadata
Fields
Template:
BOCC
Date
2/26/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOH Minutes of 022620
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Board of Health\Minutes\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Casing shall be grouted to a minimum depth of 20 feet below the natural land <br /> surface. <br /> 2. In addition to the grouting by this Rule,the casing shall be grouted as necessary to <br /> seal off all aquifers or zones that contain contaminated or other non-potable water so <br /> that contamination of overlying and underlying aquifers or zones shall not occur. <br /> 3. Bentonite slurry grout may be used in that portion of the borehole that is at least three <br /> feet below land surface.That portion of the borehole from land surface to at least <br /> three feet below land surface shall be filled with a concrete or cement-type grout or <br /> bentonite chips or pellets that are hydrated in place. <br /> 4. Grout shall be placed around the casing by one of the following methods: <br /> a) Pressure. Grout shall be pumped or forced under pressure through the <br /> bottom of the casing until it fills the annular space around the casing and <br /> overflows at the surface; <br /> b) Pumping. Grout shall be pumped into place through a hose or pipe extended <br /> to the bottom of the annular space which can be raised as the grout is applied. <br /> The grout hose or pipe shall remain submerged in grout during the entire <br /> application; or <br /> c) Other. Grout may be emplaced in the annular space by gravity flow way to <br /> ensure complete filling of the space. Gravity flow shall not be used if water or any <br /> visible obstruction is present in the annular space within the applicable minimum <br /> grout depth specified in this Rule at the time of grouting,with the exception that <br /> bentonite chips or pellets may be used if water is present and if designed for that <br /> purpose. <br /> d)The annular space of the top twenty(20)feet for wells grouted with bentonite <br /> chips or pellets must be no less than ten (10)inches in diameter for a six(6) inch <br /> casing. <br /> 5. If a Rule of this Section requires grouting of the casing to a depth greater than 20 feet <br /> below land surface,the pumping or pressure method shall be used to grout that <br /> portion of the borehole deeper than 20 feet below land surface,with the exception of <br /> bentonite chips and pellets. <br /> 6. If an outer casing is installed, it shall be grouted by either the pumping or pressure <br /> method. <br /> 7.The well shall be grouted within seven days after the casing is set. When grout is Comment[VH59]:OCHD REQUEST FOR <br /> emplaced b gravity, the entire drilling process must be completed prior to rout QUICKER GROUTING TO PROTECT EXPOSED WELL <br /> p Y g Y g p p p g BORING <br /> emplacement. When emplaced by the pump or pressure methods,the grouting COmment[VH60]:BECAUSE THE ALLOWABLE <br /> process may be initiated at any time after the casing is set, Including during the GROUT SECTION WAS RE-WRITTEN LIKE THE STATE, <br /> drilling process. IT REMOVED A VERY"OC"WAY OF FINISHING <br /> GROUT.THE FORMER WAY WAS NOT FOUND TO <br /> PRODUCE BETTER WELLS BUT IT DID ENSURE THAT <br /> 8. It is the responsibility of the well contractor to verify that the grout does not settle. THE GROUT WAS TOPPED OFF IF IT SETTLED. THIS <br /> REQUIAny settling greater than five(5)feet below the natural land surface shall require re- CONTRACTOR <br /> TwouLDALNYSLOW THE WELL <br /> CONTRACTOR TO FILL IN ANY SETTLING,BUT IF THE <br /> SETTLING IS TOO GREAT,OCHD WILL INSPECT. <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.