Browse
Search
Agenda - 10-06-20; 8-k - Approve Contract for Building Commissioning Services of Northern Campus Project
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 10-06-20 Virtual Business Meeting
>
Agenda - 10-06-20; 8-k - Approve Contract for Building Commissioning Services of Northern Campus Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 2:47:41 PM
Creation date
10/1/2020 2:58:14 PM
Metadata
Fields
Template:
BOCC
Date
10/6/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-k
Document Relationships
Agenda 10-06-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 10-06-20 Virtual Business Meeting
Minutes 10-06-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> • MTS setup and test with Mobile Generator <br /> • Panelboards/ Switchboards <br /> 4) Plumbing <br /> Detention Center <br /> • Domestic Water Heating System (Geo +4-NG Instant) <br /> • Mixing Valves/Recirc Pumps <br /> • Water Pressure Booster System <br /> Environment&A Center <br /> enter <br /> • Solar Water Heater System+EWH <br /> • Miscellaneous Tempering Valves <br /> Parks Operations Base <br /> • Domestic Water Heating System) <br /> 2) Retesting allowance (32 hours) <br /> 3) Documentation all functional testing <br /> 4) Maintain and Update Action Item List—Assist in resolution <br /> 5) Attend/Conduct Cx Progress Meetings (5 budgeted) <br /> 6) Prepare Final Commissioning report. <br /> TASK 3 —Post Acceptance Phase <br /> 1) Perform Opposite Season Testing, Trend Review, etc. <br /> 2) Update Cx report <br /> 3) End of Warranty Site Visit(-10 months from completion). <br /> 4) Prepare End of Warranty Site Visit <br /> FEES <br /> The following is a breakdown of our costs for each phase: <br /> TASK ITEM FEES <br /> 1 Execution Phase $ 28,076 <br /> 2 Acceptance Phase $ 76,913 <br /> 3 Warrant Phase $ 4,827 <br /> Total $ 109,816 <br /> The following overall clarifications are noted relative to the above fee and scope proposals. <br /> 1. Facility Dynamics will develop checklists and functional tests based on their <br /> experience for systems of these types. <br /> 2. Facility Dynamics will coordinate the certification of contractors for readiness, <br /> completion of installation,prestart and startup. <br /> 3. Testing reports will be included that document the FPT's tested. Additional retesting <br /> for failed tests will be limited to the allowance above or considered an extra service. <br /> 3 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.