Browse
Search
Agenda - 10-06-20; 8-k - Approve Contract for Building Commissioning Services of Northern Campus Project
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 10-06-20 Virtual Business Meeting
>
Agenda - 10-06-20; 8-k - Approve Contract for Building Commissioning Services of Northern Campus Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 2:47:41 PM
Creation date
10/1/2020 2:58:14 PM
Metadata
Fields
Template:
BOCC
Date
10/6/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-k
Document Relationships
Agenda 10-06-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 10-06-20 Virtual Business Meeting
Minutes 10-06-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> • RTUs (2ea) <br /> • Gas Fired Unit Heater(2ea) <br /> • Electric Unit Heater/Electric Wall Heater(5ea) <br /> • Water Source Heat Pump (17 ea) <br /> • Water-to-Water Heat Pump/ System <br /> • Split System Unit <br /> • Ductless Split System Unit(3ea) <br /> • Misc. Exhaust Fans (9ea) <br /> • Smoke Exhaust/ Supply Fans (31 ea) <br /> • MAU-1/Kitchen Hood <br /> Environment&A Center <br /> enter <br /> • RTU-1 <br /> • VAV Terminal Units (32 ea) <br /> • Ductless Split System Unit(2 ea) <br /> • Misc. Exhaust Fans (6 ea) <br /> • Electric Unit Heater(3ea) <br /> Parks Operations Base <br /> • H&V Unit <br /> • Packaged Heat Pump (2ea) <br /> • Infrared Heaters (3 ea) <br /> • Misc. Exhaust Fans (10 ea) <br /> 2) TAB Verification <br /> • Review TAB reports, select 20% sample (typical for all 3 buildings) <br /> 3) Electrical <br /> Detention Center <br /> • Emergency Generator <br /> • ATS Switches (3ea @ 100%) <br /> • Building Loss of Power(incl. verification of E.P. systems) <br /> • UPS <br /> • Exterior Lighting Control/Occ Sensor controlled lighting <br /> • Panelboards/ Switchboards <br /> Environment&A Center <br /> enter <br /> • Lighting Control <br /> • PV System <br /> • NITS setup and test with Mobile Generator <br /> • Panelboards/ Switchboards <br /> Parks Operations Base <br /> • Lighting Control <br /> • PV System <br /> 2 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.