Browse
Search
Agenda - 10-06-20; 6-c - Zoning Atlas Amendment – Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 10-06-20 Virtual Business Meeting
>
Agenda - 10-06-20; 6-c - Zoning Atlas Amendment – Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 2:20:28 PM
Creation date
10/1/2020 2:58:12 PM
Metadata
Fields
Template:
BOCC
Date
10/6/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda 10-06-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 10-06-20 Virtual Business Meeting
Minutes 10-06-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Development within the Project shall be served by public water and sewer <br />services as provided and maintained by the Town of Hillsborough; <br />additional and/or alternative water and/or wastewater systems shall not be <br />permitted. <br />b. A written, signed agreement between a developer, Orange County, and <br />the Town of Hillsborough shall be executed describing the timing, phasing, <br />design, and financing of public water distribution and public sanitary sewer <br />collection mains; <br />c. Water systems and water pressure shall comply with all applicable Town <br />of Hillsborough utility standards, building, and fire codes based on the <br />proposed land use; <br />d. Sizing/looping of utility lines shall be based on the proposed development, <br />including water flow test data and shall be reviewed and approved by <br />County staff, Town of Hillsborough Planning Director, and the Town of <br />Hillsborough Utility Director; <br />e. Fire-flow test(s) of all installed hydrants shall be conducted, in <br />coordination with the Town of Hillsborough and Orange County <br />Emergency Services, to ensure compliance with applicable State Fire <br />Code standards. <br />VIII OTHER: 6 <br />a. No permanent fuel or chemical storage shall occur within 30 ft. of a <br />floodplain/stream buffer established consistent with the provisions of <br />Section 6.13 of the County UDO. <br />b. A minimum of 2 electrical vehicle charging stations shall be installed for <br />every building constructed on-site. Additional stations may be proposed <br />as part of the site plan review process. <br /> <br />BE IT FURTHER ORDAINED THAT this ordinance be placed in the book of <br />published ordinances and that this ordinance is effective upon its adoption. <br /> <br />Upon motion of Commissioner ________________________, seconded by <br />Commissioner ________________________, the foregoing ordinance was adopted this <br />________ day of ___________________, 2020. <br /> I, Greg Wilder, Interim Clerk to the Board of Commissioners for Orange County, <br />DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings <br />of said Board at a meeting held on ________________________, 2020 as relates in <br /> <br />6 These 2 conditions were added to address Planning Board comments from the August 5 and 19, 2020 meeting. <br />The applicant agreed to the imposition of these conditions. <br />67
The URL can be used to link to this page
Your browser does not support the video tag.