Browse
Search
Agenda - 10-06-20; 6-c - Zoning Atlas Amendment – Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 10-06-20 Virtual Business Meeting
>
Agenda - 10-06-20; 6-c - Zoning Atlas Amendment – Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 2:20:28 PM
Creation date
10/1/2020 2:58:12 PM
Metadata
Fields
Template:
BOCC
Date
10/6/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda 10-06-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 10-06-20 Virtual Business Meeting
Minutes 10-06-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Twenty percent (20%) of a building’s perimeter shall <br />be landscaped while maintaining the necessary <br />sidewalk area. <br />b. These areas may consist of lawn, planters, or shrub <br />areas so long as the shrub areas, that have to be <br />twenty-four inches (24”) minimum in width, comprise a <br />minimum of twenty percent (20%) of the total linear <br />dimension along the building’s perimeter <br />3. With respect to internal street landscaping, there shall be <br />one (1) tree at a one-inch (1”) caliper provided every one <br />hundred (100) feet; <br />4. All ground level HVAC, mechanical equipment cabinets, <br />solid waste containers, dumpsters, recycling bins, etc. shall <br />be screened from view through the use of landscaping, <br />walls, and or fencing in accordance with Section 6.8.9 of the <br />UDO. <br />iv. The Project shall comply with the provisions of Section 6.6.4 of the <br />UDO related to preservation of required buffers within the Major <br />Transportation Corridor (MTC) overlay district. This includes the <br />ability to create visual breaks in the buffer in accordance with <br />Section 6.6.4 (A) (5). <br />e. Parking: <br />i. Parking lot design and layout shall be in accordance with Section <br />6.9 of the UDO; <br />ii. 1 space shall be required for every 750 sq.ft. of office space; <br />iii. 1 space per 3,000 sq.ft. of additional indoor area (exclusive of office <br />area). <br /> STAFF COMMENT: The proposed standard does not <br />address all anticipated land uses for the Project. Staff has <br />recommended the applicant comply with the provisions of <br />Section 6.9.7 of the UDO, specifically: <br />• General Office and Service Uses: 1 space for <br />every 300 sq.ft. of gross floor area. <br />• Medical Office: 1 space for every 300 sq.ft. of <br />gross floor area. <br />• Manufacturing: 1 space per employee on the shift <br />of maximum employment. <br />• Retail: 1 space for every 300 sq.ft. of 300 sq.ft. of <br />gross floor area. <br />61
The URL can be used to link to this page
Your browser does not support the video tag.