Orange County NC Website
xv. Bio retention basins (i.e. rain gardens) shall be incorporated into <br />the Project to capture and treat runoff from truck wells within <br />proposed loading docks; <br />xvi. No barbed wire products shall be used/incorporated on the 12 acre <br />parcel along Davis Road; <br />xvii. Low flow toilets and water fixtures shall be used within the <br />development for all restroom or general use facilities not associated <br />with a manufacturing or research process. 5 <br />d. Landscaping/Buffering: <br />i. All required landscaping shall be installed and maintained by the <br />developer or their successor in perpetuity; <br />ii. Existing vegetation shall be preserved in identified buffer areas as <br />indicated on the approved master concept plan. In those instances <br />where foliage is disturbed or non-existent, landscaping shall be <br />installed consistent with the following schematic: <br /> <br /> STAFF COMMENT: Staff recommends the minimum linear <br />foot of planting be reduced to 100 ft. (i.e. the number of <br />trees for every 100 ft. of required buffer area versus 150 ft. <br />as proposed by the applicant) consistent with Section 6.8.6 <br />(F) of the UDO. <br /> <br />5 Yellow highlight denotes new conditions recently proposed by the applicant during the public hearing in an <br />attempt to address BOCC and adjacent property owner concerns over the incorporation of ‘green building <br />standards’ for the Project. The applicant and staff are still reviewing proposed language. <br />59