Orange County NC Website
vehicle charging. I will just put the number out there at 1 station per 100.000 square feet of space to be built. Those 611 <br />are my largest concerns at the moment. 612 <br /> 613 <br />Michael Harvey: Chair Blankfard, if I could interject quickly. I’m sorry I know that Ms. Poole lost her internet access if 614 <br />I recall what Perdita said. One of her concerns was more specificity in land uses. In terms of what would fall into this 615 <br />categories and what would not. At least that’s what I have in my notes. 616 <br /> 617 <br />Hunter Spitzer: If I may say one more thing, particularly to the residents that are listening. A lot of what we’ve been 618 <br />doing over the past hour has been talking about conditions that we would like to request from the developer, that’s 619 <br />the nice part about this master planning conditional zoning is that we can ask for certain conditions to be met and so 620 <br />if you all and I understand that you are all very opposed to this but in the off chance that it can’t be stopped, you do 621 <br />have the opportunity to shape this development through this process and so I encourage you to consider what you 622 <br />might want to put in as conditions if at all possible. 623 <br /> 624 <br />David Blankfard: I have a huge concern about the traffic being dumped onto Davis Drive. Not just some of the traffic 625 <br />but everything is going to be dumped onto Davis Drive because NCDOT does not want anybody to come out the 626 <br />service road. So I don’t know if anybody else feels that way or if we want to see if the applicant can come up with a 627 <br />better way of getting access to the site. Are we comfortable making a decision now or wanting to wait? 628 <br /> 629 <br />Hunter Spitzer: I move that we delay a decision on our recommendation until our next meeting on September 2nd. 630 <br /> 631 <br />Michael Birch: This is Michael Birch, the applicant, I think the outstanding issues that appear to be out there are one 632 <br />responses from DOT but I want to reiterate that whatever DOT comes back with in terms of requested improvements, 633 <br />those will be made. So it’s not really a negation in that respect. Second with regard to some of the comments about 634 <br />Davis Drive, I just think it is not possible for us to prohibit access onto Davis Drive. Third, with regard to some of the 635 <br />comments or requests for the conditions the design of the buildings with intent to accommodate solar, providing 636 <br />some electric vehicle charging stations and no fuel storage adjacent to the flood plain. I am comfortable with we can 637 <br />craft those conditions and extremely short order and so I would respectfully ask but because of the date of the next 638 <br />Planning Board meeting being on the 2nd essentially eliminates our opportunity to get to the Board of Commissioner’s 639 <br />meeting on the 15th. I would ask that the Planning Board please consider meeting or adjourning to a date certain 640 <br />possibly 2 weeks from today on the 19th. 641 <br /> 642 <br />David Blankfard: I think we could do the 19th to reconvene. 643 <br /> 644 <br />Adam Beeman: I was going to ask Craig or Michael Harvey, with what Mr. Birch said about whatever DOT comes 645 <br />back and they’re going to rectify whatever DOT says they need to do. Do you guys feel comfortable with moving 646 <br />forward knowing whatever DOT may say or would it be better to meet a date later once the DOT issues have been 647 <br />straightened out? 648 <br /> 649 <br />Craig Benedict: Let me just give a brief introduction about NCDOT is in charge of the roads within Orange County so 650 <br />they are the ultimate authority on what improvements are made because counties in North Carolina are not in the 651 <br />road business so they take, their recommendations are of prime importance and as the developer said they will have 652 <br />to do whatever NCDOT says. We work with DOT and we will take the comments that we have from tonight and 653 <br />impart them to NCDOT for any alternatives that there may be but NCDOT is also in the business to use taxpayer 654 <br />money to use the roadways to their best ability. My opinion if you want to call it that is that we will be satisfied with 655 <br />what NCDOT suggest as improvements for the project. 656 <br /> 657 <br />Kim Piracci: I just want to say that it seems to me that the traffic that’s being talked about, even if it could be 658 <br />arranged in such a way that the traffic only comes and goes from 40 to Old 86 and never hits Davis it just seems like 659 <br />an enormous amount of traffic even just for Old 86. Even though I understand there’ll be road expansion and 660 <br />whatnot so I just, I feel like the scope of the project is just too big for this space in Orange County. Maybe smaller 661 <br />warehouses or two instead of three. I don’t know but in any case it just seems like too much. To me it seems all 662 <br />that’s too much. 663 <br /> 664 <br />Hunter Spitzer: Do you have an expected return date from NCDOT on those comments? An anticipated time? 665 <br /> 666 <br />16