Orange County NC Website
6 <br /> 4. Facility Dynamics assumes that the general contractor(and its Subcontractors, as <br /> applicable)will contribute the appropriate Trade Specialists to participate in all <br /> required startup tests/checks and FPT's where appropriate. <br /> 5. This fee includes the use of our commissioning software tool (CACEA)to manage <br /> much of the information necessary for Commissioning electronically. <br /> Feel free to contact me if you need any further information or breakdown of costs. We would be <br /> glad to meet with you or any other staff to review our detailed cost estimate and scope for this <br /> project. <br /> Sincerely, <br /> FACILITY DYNAMICS ENGINEERING CORPORATION <br /> '( <br /> Kevin D. Shortt, PE <br /> 4 1 P a g e <br />