Orange County NC Website
5 <br /> • MTS setup and test with Mobile Generator <br /> • Panelboards/ Switchboards <br /> 4) Plumbing <br /> Detention Center <br /> • Domestic Water Heating System (Geo +4-NG Instant) <br /> • Mixing Valves/Recirc Pumps <br /> • Water Pressure Booster System <br /> Environment&A Center <br /> enter <br /> • Solar Water Heater System+EWH <br /> • Miscellaneous Tempering Valves <br /> Parks Operations Base <br /> • Domestic Water Heating System) <br /> 2) Retesting allowance (32 hours) <br /> 3) Documentation all functional testing <br /> 4) Maintain and Update Action Item List—Assist in resolution <br /> 5) Attend/Conduct Cx Progress Meetings (5 budgeted) <br /> 6) Prepare Final Commissioning report. <br /> TASK 3 —Post Acceptance Phase <br /> 1) Perform Opposite Season Testing, Trend Review, etc. <br /> 2) Update Cx report <br /> 3) End of Warranty Site Visit(-10 months from completion). <br /> 4) Prepare End of Warranty Site Visit <br /> FEES <br /> The following is a breakdown of our costs for each phase: <br /> TASK ITEM FEES <br /> 1 Execution Phase $ 28,076 <br /> 2 Acceptance Phase $ 76,913 <br /> 3 Warrant Phase $ 4,827 <br /> Total $ 109,816 <br /> The following overall clarifications are noted relative to the above fee and scope proposals. <br /> 1. Facility Dynamics will develop checklists and functional tests based on their <br /> experience for systems of these types. <br /> 2. Facility Dynamics will coordinate the certification of contractors for readiness, <br /> completion of installation,prestart and startup. <br /> 3. Testing reports will be included that document the FPT's tested. Additional retesting <br /> for failed tests will be limited to the allowance above or considered an extra service. <br /> 3 1 P a g e <br />