Browse
Search
Agenda - 08-27-2001-c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 08-27-2001
>
Agenda - 08-27-2001-c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:10:43 PM
Creation date
8/29/2008 10:34:01 AM
Metadata
Fields
Template:
BOCC
Date
8/27/2001
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 08-27-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ <br />1. Notification of Spills <br />a) Notwithstanding other requirements of law, as soon as any person <br />responsible for a facility or operation, or responsible for emergency <br />response for a facility or operation has information of any known or <br />suspected release of materials which are resulting or may result in illegal <br />discharges or pollutants discharging into or may reach the stormwater <br />collection system or waters of the Neuse River Basin in Orange County, <br />said person shall take all necessary steps to ensure the discovery, <br />containment, and cleanup of such discharge. In the event of such a <br />discharge of hazardous materials, said person shall immediately notify <br />emergency response agencies of the occurrence via emergency dispatch <br />services, and shall notify the County within twenty-four (24) hours. In the <br />event of a discharge of non- hazardous materials, said person shall notify <br />the County no later than the next business day. All notifications shall be <br />confirmed by written notice addressed and mailed to the County within <br />three (3) business days of the discharge. <br />b) Notification shall not relieve said person of: <br />(1) any liability ar expense related to the discharge. <br />(2) restoration of any area affected by the discharge to preexisting <br />conditions_ <br />(3) liability or violation of any regulatory body ofthe County, <br />State or Federal government. <br />Section 15Inspections and Investigations. <br />A. Site Inspections <br />Agents, officials, or other qualified persons authorized by the County will periodically <br />inspect on-site BMPs, protected buffers, and illegal discharges to ensure: <br />1, compliance with th~A~~this Ordinance, <br />2. whether the measures required in the plan are being constructed in accordance <br />with the approved plan; <br />3. whether the permanent BMPs are in need of any maintenance including, but <br />not limited ta, the following: <br />a) mowing of vegetation, <br />b) vegetation re-establishment, <br />c) tree removal (especially from wet detention ponds), <br />d) stabilization of any eroding areas, and <br />e) structural (pipe, riser, dam, etc) repair. <br />B. Notice of the right to inspect shall be included in the letter of approval of each <br />Stormwater Management Plan. <br />C. Authority to Enter Property and Conduct Investigations and Inspections <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.