Browse
Search
Agenda - 08-27-2001-c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 08-27-2001
>
Agenda - 08-27-2001-c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:10:43 PM
Creation date
8/29/2008 10:34:01 AM
Metadata
Fields
Template:
BOCC
Date
8/27/2001
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 08-27-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ono <br />Section 9 BMP Construction <br />A. Total Nitrogen Removal Rates <br />Each BMP receives an assigned TN (total nitrogen) removal rate. <br />BMP Type TN Removal Rate Appropriate Design Standazds <br />Wet detention ponds 25% NC and MD Design Manuals <br />Constructed wetlands 4Q% NC and MD Design Manuals <br />Open channel practices 30% NC and MD Design Manuals <br />Riparian buffers 30% Orange Co. Buffer Standards <br />Vegetated buffer strips with <br />level spreader 20% NC and MD Design Manuals <br />Bioretention 25% NC and MD Design Manuals <br />Sand filters 35% NC and MD Design Manuals <br />Other BMPs vazies subject to Orange County and <br />NCDENR-DWQ approval <br />1. If more than one BMP is installed in series on a development, then the <br />removal rate shall be determined through SERIAL rather than additive <br />calculations. <br />a) Example: <br />If a wet detention pond discharges through a riparian buffer, then the TN <br />removal rate would be 47.5%. This number is reached by assuming that <br />the pond removes 25% of the TN and dischazges 75% into the riparian <br />buffer. The buffer then removes 30% of the nitrogen discharged by the <br />pond, which is 22.5%. This totals 47.5% (25% + 22.5%= 47.5%). <br />The removal rate is NOT 25% plus 30%. <br />B. Surety <br />The financially responsible party may be required to file with Orange County an <br />improvement security, performance bond or letter of credit in the form of an escrow <br />account or other instruments satisfactory to the. County attorney in the amount deemed <br />sufficient by the County to cover all costs of repairing or installing the required <br />Permanent BMPs according to requirements of this Ordinance, and the approved <br />Stormwater Management Plans. The amount of such surety requirement shall be <br />determined by the County. Such surety shall be valid until the work is completed in <br />accordance with the Stormwater Management Plan and until same is released by the <br />County. Applicable surety shall be forfeited upon violation of this Ordinance and shall be <br />used to establish protective cover on the site, to control the velocity of runoff, and/or <br />prevent off site nitrogen export. Any monies in excess of the cast of providing protective <br />measures shall be refunded to the applicant. Surety shall be released when the County has <br />certified that the requirements of this Ordinance have been met. Surety amounts will be <br />determined by rates set iri the Orange County Planning Fee Schedule. <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.