Browse
Search
Agenda - 08-27-2001-c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 08-27-2001
>
Agenda - 08-27-2001-c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:10:43 PM
Creation date
8/29/2008 10:34:01 AM
Metadata
Fields
Template:
BOCC
Date
8/27/2001
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 08-27-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:~ <br />engineer shall prepare the plan with the Engineer's Certification of Stormwater <br />Management as shown in Appendix 3 affixed, signed, sealed and dated. <br />E. Fees <br />The Stormwater Management Plan Review Fee shall be paid at the time of submittal. The <br />fee shall be based upon the current Orange County Planning Fee Schedule. <br />F. Appeals <br />Appeals of the Enforcement Officer's decision on a Stormwater Management Plan shall <br />be made to the Orange County Planning Director. If the Planning Director upholds the <br />decision, the person shall be entitled to a public hearing if such person submits written <br />demand for a heaiing within 15 days after receipt of written notice of disapproval, <br />modification, or conditions of approval. <br />1. Hearings held pursuant to this section shall be conducted by the Orange <br />County Planning Board within 30 days after receipt of written demand for such <br />hearing made by the person submitting the plan <br />2. The Orange County Planning Board shall make recommendations to the <br />Board of Commissioners of Orange County within 30 days after the date of the <br />hearing on such erosion control plan. <br />3. The Board of Commissioners of Orange County will render its final decision <br />on any erosion control plan upon which a hearing is requested within 30 days of <br />receipt of the recommendations from the agency conducting the hearing. <br />Section S Permanent Nitrogen Export Reduction Best Management Practices <br />A. Permanent On-site Nitrogen Export Reduction BMPs <br />The following on-site BMPs may be utilized for reducing nitrogen from new <br />developments: <br />1. Wet detention ponds <br />2. Constructed wetlands <br />3. Open channel practices <br />4. Ripazian buffers <br />5. Bioretention <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.