Browse
Search
Agenda - 08-27-2001-c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 08-27-2001
>
Agenda - 08-27-2001-c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:10:43 PM
Creation date
8/29/2008 10:34:01 AM
Metadata
Fields
Template:
BOCC
Date
8/27/2001
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 08-27-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V f <br />f <br />following multipliers to the impacts determined in Section G.3.B of this <br />Ordinance to each zone of the riparian buffer: <br />(1) Impacts to Zone 1 of the riparian buffer shall be multiplied by <br />3. <br />(2) Impacts to Zone 2 of the riparian buffer shall be multiplied by <br />1.5. <br />(3) Impacts to wetlands within Zones 1 and 2 of the riparian buffer <br />that are subject to mitigation under 15A NCAC 2H .0506 shall <br />comply with the mitigation ratios in 15A NCAC 2H .0506. <br />4. THE LOCATION OF MITIGATION. The mitigation effort shall be the same <br />distance from the Neuse River estuary as the proposed impact, or closer to the <br />estuary than the impact, and as close to the location of the impact as feasible. <br />5. ISSUANCE OF THE MITIGATION DETERMINATION. The County shall <br />issue a mitigation determination that specifies the required area and location of <br />mitigation pursuant to Section G.3 and G.4 of this Ordinance. <br />6. OPTIONS FOR MEETING THE MITIGATION DETERMINATION. The <br />mitigation determination made pursuant to Section G.5 may be met through one <br />of the following options: <br />a) Payment of a compensatory mitigation fee to the Riparian Buffer <br />Restoration Fund pursuant to Section G.7 of this Ordinance. <br />b) Other options may be available through the Wetlands Restoration <br />Program. <br />7. RIPARIAN BUFFER RESTORATION OR ENHANCEMENT. Persons who <br />choose to meet their mitigation requirement through riparian buffer restoration or <br />enhancement shall meet the following requirements: <br />a) The applicant may restore or enhance anon-forested riparian buffer if <br />either of the following applies: <br />(1) The area of riparian buffer restoration is equal to the required <br />area of mitigation determined pursuant to Section G.3 of this <br />Ordinance. <br />(2) The area of riparian buffer enhancement is three times larger <br />than the required area of mitigation determined pursuant to <br />Section G.3 of this Ordinance. <br />b) The location of the riparian buffer restoration or enhancement shall <br />comply with the requirements in Section G.4 of the Ordinance. <br />c) The riparian buffer restoration or enhancement site shall have a <br />minimum width of 50 feet as measured horizontally on a line <br />perpendicular to the surface water. <br />d) The applicant shall first receive an Authorization Certificate for the <br />proposed use according to the requirements of 15A NCAC 2B .0233. <br />After receiving this determination, the applicant shall submit a restoration <br />or enhancement plan for approval by the County. The restoration or <br />enhancement plan shall contain the following. <br />(1) A map of the proposed restoration or enhancement site. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.