Orange County NC Website
o~~ <br /> )xempt Allowable Allowable Prohibited <br /> with <br /> Mitigation <br />Temporary roads: <br />• Temporary roads that disturb less than or equal to 2,500 X <br />square feet provided that vegetation is restored within six <br />months of initial disturbance <br />• Temporary roads that disturb greater than 2,500 square X <br />feet provided that vegetation is restored within six months <br />of initial disturbance <br /> X <br />• Temporary roads used for bridge construction or <br />replacement provided that restoration activities, such as <br />soil stabilization and revegetation, aze conducted <br />immediately after construction <br />Temporary sediment and erosion control devices: <br />• In Zone 2 only provided that the vegetation in Zone 1 is X <br />not compromised and that dischazge is released as <br />diffuse flow in accordance with Section 3.C <br />• In Zones 1 and 2 to control impacts associated with X <br />uses approved by the Division or that have received a <br />variance provided that sediment and erosion control <br />for upland areas is addressed to the maximum extent. <br />practical outside the buffer <br />• In-stream temporary erosion and sediment control X <br />measures for work within a stream channel <br />Underground electric utility lines: <br />• Impacts other than perpendicular crossings in Zone 2 X <br />only s <br />• Impacts other than perpendicular crossings in Zone la, a X <br />10 <br />