Browse
Search
Agenda - 08-27-2001-c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 08-27-2001
>
Agenda - 08-27-2001-c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:10:43 PM
Creation date
8/29/2008 10:34:01 AM
Metadata
Fields
Template:
BOCC
Date
8/27/2001
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 08-27-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o~~ <br /> )xempt Allowable Allowable Prohibited <br /> with <br /> Mitigation <br />Temporary roads: <br />• Temporary roads that disturb less than or equal to 2,500 X <br />square feet provided that vegetation is restored within six <br />months of initial disturbance <br />• Temporary roads that disturb greater than 2,500 square X <br />feet provided that vegetation is restored within six months <br />of initial disturbance <br /> X <br />• Temporary roads used for bridge construction or <br />replacement provided that restoration activities, such as <br />soil stabilization and revegetation, aze conducted <br />immediately after construction <br />Temporary sediment and erosion control devices: <br />• In Zone 2 only provided that the vegetation in Zone 1 is X <br />not compromised and that dischazge is released as <br />diffuse flow in accordance with Section 3.C <br />• In Zones 1 and 2 to control impacts associated with X <br />uses approved by the Division or that have received a <br />variance provided that sediment and erosion control <br />for upland areas is addressed to the maximum extent. <br />practical outside the buffer <br />• In-stream temporary erosion and sediment control X <br />measures for work within a stream channel <br />Underground electric utility lines: <br />• Impacts other than perpendicular crossings in Zone 2 X <br />only s <br />• Impacts other than perpendicular crossings in Zone la, a X <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.