Browse
Search
080520 Planning Board Minutes
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Minutes
>
2020
>
080520 Planning Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 1:32:23 PM
Creation date
9/29/2020 1:20:16 PM
Metadata
Fields
Template:
BOCC
Date
8/5/2020
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
Planning Board - 080520 Agenda Packet
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Agendas\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved 9/2/2020 <br /> 1168 <br /> 1169 Hunter Spitzer: This is more of a question for the planning staff. There are UDO regulations to control that correct? <br /> 1170 Fuel storage. <br /> 1171 <br /> 1172 Michael Harvey: It's actually regulated by the North Carolina State Fire Code, not necessarily by zoning. In terms of <br /> 1173 distance from structure, how stored, how protected, and how maintained it's actually going to be addressed through <br /> 1174 compliance with the fire code and what I want to remind everybody that site plans that are submitted have to go <br /> 1175 through the development review process with Orange County, which requires the fire marshal's office to sign off on <br /> 1176 them. That is going to be a component of any and all review. So this will come up at the appropriate time by the <br /> 1177 appropriate entity if proposed. <br /> 1178 <br /> 1179 Hunter Spitzer: Can I simply request that the developer agree as a condition not to put fuel storage adjacent to their <br /> 1180 vegetative buffer of the flood plain. <br /> 1181 <br /> 1182 Michael Birch: Yes,we can agree to that. <br /> 1183 <br /> 1184 David Blankfard: This is a question for Michael, is the building height determined by how tall the fire department can <br /> 1185 raise their ladder? <br /> 1186 <br /> 1187 Michael Harvey: So Mr. Blankfard let me answer that question this way, obviously there are height limits enforced <br /> 1188 under Orange County General Use Zoning Districts and 60 feet is the potential building height that would be allowed <br /> 1189 (for this MPD-CZ). You are correct that building height is usually determined by available ... or I should say one of <br /> 1190 the factors in determining allowable building height ... is available infrastructure to fight fire. I think that without <br /> 1191 putting words in the applicant's mouth or stealing their thunder, one of the reasons this site has so much traction is <br /> 1192 because of the availability of water and sewer service and the potential for sprinklered buildings addressing some of <br /> 1193 these concerns as well. There's also, in their narrative discussions about the potential to allow for water towers on <br /> 1194 the property that might be used in addressing that very particular issue as well. <br /> 1195 <br /> 1196 David Blankfard: Is there any requirements for high beams on the trucks and cars spilling over our property line? <br /> 1197 Something similar to what happens in parking decks? <br /> 1198 <br /> 1199 Michael Birch: I think that's likely addressed through the vegetated buffer around the perimeter. I think largely, 1 <br /> 1200 think Michael Harvey can correct me if I'm wrong, largely the County's Lighting Ordinance with regard to site lighting <br /> 1201 but again I think we anticipate that vegetated buffer around the perimeter of the site would mitigate those headlights. <br /> 1202 <br /> 1203 Michael Harvey: Chair Blankfard, this is Michael Harvey, Mr. Birch is correct our lighting regulations particularly <br /> 1204 address outdoor lighting, building security lighting and whatnot they don't address or they are not designed to <br /> 1205 address lights from vehicles. <br /> 1206 <br /> 1207 David Blankfard: Would the developer be willing to try to mitigate those high beams? <br /> 1208 <br /> 1209 Michael Birch: I think we're trying to through the use of those perimeter buffer yards and also one, the vegetation <br /> 1210 and two the distance and also the location of where our parking area are or anticipate them to be. I think it would be <br /> 1211 hard for us to articulate an objective standard but just to answer your question more broadly, I think yes we will try to <br /> 1212 mitigate that but it's hard for me to think of an objective standard that we could apply as a condition. <br /> 1213 <br /> 1214 Melissa Poole: So you don't have actual companies going into this location into this space yet, is that correct? <br /> 1215 <br /> 1216 Michael Birch: That's correct. <br /> 1217 <br /> 1218 Melissa Poole: Ok, so if you're looking at manufacturing and possibly laboratory and research are you looking at that <br /> 1219 they would have the ability to operate multiple shifts? <br /> 1220 <br /> 1221 Michael Birch: Yes, potentially a building user could have multiple shifts that is correct? <br /> 1222 <br />
The URL can be used to link to this page
Your browser does not support the video tag.