Browse
Search
OUTBoard Agenda Packet - 021920
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2020
>
OUTBoard Agenda Packet - 021920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 8:32:44 AM
Creation date
9/14/2020 8:32:11 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2020
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT MPO Board 2/12/2020 Item 18 <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> R-5821A Construct operational improvements including 6/21/2022 FY2024 $5,326,000 Planning and design activities underway- Chris Smitherman <br /> 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR Executive Hold, coordinating with NC54 <br /> 47093.2.2 1006(Orange Grove Road)to SR 1107/SR 1937(Old West Corridor Study <br /> 47093.3.2 Fayetteville Road). <br /> 1-3306AA 1-40 widening from 1-85 to NC86 in Chapel Hill 10/18/2022 FY2025 $76,265,000 Planning and Design activities underway, Laura Sutton <br /> 34178.1.4 Environmental document completed 3/21/19 <br /> 34178.2.3 under 1-3306A <br /> 34178.3.7 <br /> 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/21/2023 FY2025 $7,455,000 Funding approved 10/10/17-Executive Chris Smitherman <br /> 45910.1.1 (Buckhorn Road)to West of SR 1006 (Orange Grove Road) Hold <br /> 45910.3.1 <br /> U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 1- 7/16/2024 FY 2027 $49,751,000 Planning and Design activities underway- Laura Sutton <br /> 50235.1.1 40 to Eno River in Hillsborough Executive Hold, Coordinate with U-5848 <br /> 50235.2.1 and 1-5967 <br /> 50235.3.1 <br /> 1-5967 Interchange improvements at 1-85 and SR 1009(South 10/15/2024 FY2027 $20,700,000 Planning and Design activities underway- Laura Sutton <br /> 45917.1.1 Churton Street)in Hillsborough Executive Hold, Coordinate with 1-0305 <br /> 45917.2.1 and U-5845 <br /> 45917.3.1 <br /> 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/19/2024 FY2026 $11,155,000 Funding approved 10/10/17-Executive Chris Smitherman <br /> 45911.1.1 (Orange Grove Road)to Durham County line Hold, Coordinate with 1-5967, 1-5984 and I- <br /> 45911.3.1 0305 <br /> 1-5984 Interchange improvements at 1-85 and NC 86 in 11/18/2025 FY2027 $16,488,000 Planning and Design activities underway- Laura Sutton <br /> 47530.1.1 Hillsborough Executive Hold, Coordinate with 1-0305 <br /> 47530.2.1 and 1-5959 <br /> 47530.3.1 <br /> 1-0305 Widening of 1-85 from west of SR1006 (Orange Grove Road) 1/19/2027 FY2029 $133,400,000 Planning and design activities underway- Laura Sutton <br /> 34142.1.2 in Orange Co. to west of SR 1400 (Sparger Road) in Orange Executive Hold, Project reinstated per <br /> 34142.2.2 Co. 2020-2029 STIP(funded project)and delete <br /> 34142.3.2 1 1 1 1 promect 1-5983 <br /> Executive Hold-NCDOT has temporary suspended some projects due to budget/cash flow restrictions. <br /> Page 2 DCHCMPO Dec. 2019 <br /> Page 14 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.