Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT MPO Board 2/12/2020 Item 1� <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> W-5707K Remove and replace existing curb&gutter and sidewalk, 5/31/2019 11/1/2019 $350,000 Construction- 100%complete, Pending Chris Smitherman <br /> 48283 add pedestrian signals, concrete island, and signal RTE final inspection Derek Dixon <br /> modifications on SR 1010(E. Main St/W. Franklin St)from <br /> Brewer Ln to Graham St. in Chapel Hill and Carrboro <br /> SM-5707H "To Pass Bicycles,4 ft Min Clearance or Change Lane"sign May. 2020 Jun. 2020 $5,000 Signs installed 10/17/19- 100% complete, Dawn Mcpherson <br /> 48912.3.1 installations on portions of no passing zones on SR 1107 Pending RTE final inspection <br /> (Hillsborough Road)and SR 1104 (Dairyland Road). <br /> SS-6007C Guardrail installation on NC 86 just north of SR 1839 Jul. 2020 Aug.2020 $50,400 Funds approved 9/5/19 but not released Chad Reimakoski <br /> 48888.1.1 (Alexander Drive). Derek Dixon <br /> 48888.3.1 <br /> SS-4907CD Horizontal curve improvements on SR 1710(Old NC 10) Jun. 2021 Nov. 2021 $261,000 Planning and design activities underway Chad Reimakoski <br /> 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of <br /> 47936.2.1 Hillsborough. Improvements consist of wedging pavement <br /> 47936.3.1 and grading shoulders. <br /> P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2021 FY2022 $7,200,000 PE funding scheduled 7/1/2020- Executive Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough Hold, Coordinate with U-5848 <br /> 46395.3.1 <br /> 1-3306AC Interchange improvements at 1-40 and NC86 in Chapel Hill 10/19/2021 FY2023 $20,700,000 Planning and Design activities underway- Laura Sutton <br /> 34178.1.6 Executive Hold, Environmental document <br /> 34178.2.5 completed 3/21/19 under 1-3306A <br /> 34178.3.9 <br /> 1-3306AB 1-40 widening from NC86 to Durham Co. line (US 15/501 3/15/2022 FY2024 $38,635,000 Planning and design activities underway, Laura Sutton <br /> 34178.1.5 Interchange). Includes a portion of interchange Environmental document completed 3/21/19 <br /> 34178.2.4 improvements 1-3306AC in Chapel Hill under I-3306A, Project combined with W- <br /> 34178.3.8 5707C <br /> W-5707C Revise pavement markings and overhead lane use signs for 3/15/2022 FY2022 $395,000 No bids on most recent letting, Project Chad Reimakoski <br /> 44853.1.3 removal of inside lane drop configuration on 1-40 Westbound combined with 1-3306AB <br /> 44853.3.3 in vicinity of US 15-501 interchange in Chapel Hill. <br /> 47490 Resurfacing 1-40 WB by use of contingency funds <br /> Page 1 DCHCMPO Dec. 2019 <br /> Page 13 of 16 <br />