Orange County NC Website
<br />8 <br />ARTICLE 6 -APPLICATION OF DEM, INSIONAL REQUIREMENTS Icontinuedl <br />Ordinance Requirements <br />PLANNING BOARD EVIDENCE SUBMITT D TO BOCC <br />FINDINGS SUPPORT FINDINGS FINDINGS <br />e) Required minimum ) Yes ! No The applicant is proposing T Yes _ No <br />pedestrian/landscape ratio - .21 544,800 sq. ft. <br />The minimum amount of <br />pedestrian/landscape open <br />space is 435,341, <br />ARTICLE 8.2.4 -SPECIFIC STANDARDS/ALL SPECIAL USES 1"Yes" indicates compliance: "No" indicates <br />non-comoliancel <br /> PLANNING BOARD EVIDENCE SUBMITTED TO BOCC <br /> FINDINGS SUPPORT FINDINGS FINDINGS <br />Ordinance Reauireme~ts <br />Article 8.2.4 requires the <br />applicant to address the <br />following: <br />a) Method and adequacy of Yes ! No Letter from the Health _ Yes ~ No <br />provision for sewage disposal Department indicates that new <br />facilities, solid waste and water septic system has been <br />service. installed and a new well has <br /> been drilled. <br />b) Method and adequacy of X Yes _ No The Caldwell Volunteer Fire _ Yes _ No <br />police, fire, and rescue squad Department located on Guess <br />protection. Road provides fire protection. <br /> The Orange County Emergency <br /> Management, Division of EMS, <br /> provides emergency medical <br /> $eNICBS. <br />c) Method and adequacy of X Yes ~ No A private driveway provides _ Yes ~ No <br />vehicle access to the site and access to the site from NC 57. <br />traffic conditions around the <br />site. <br />ARTICLE 8.8.24 -SPECIFIC STANDARDS FOR EVALUATION/HISTOA_ lC STRU~TlfR1=S -NON-RESIDENTIAL <br />REUSE/MIXED USE 1"Yes"_indicates compliance: "No" indicates non-comoliancel <br />Article 8.8.24.1 requires that the following information be submitted as part of the application: <br />PLANNING BOARD EVIDENCE SUBMITTED TO BOCC <br />FIN",,, DINGS SUPPORT FINDINGS FINDIN <br />Ordinance Requirements <br />a. Site plan containing the <br />following: <br />1) location, width, and type <br />of all pedestrian circulation <br />2) location and dimensions of <br />on-site signage <br />X Yes ~ No <br />Yes _ No <br />There is an existing drive, <br />which will provide adequate <br />circulation. <br />Dne free-standing sign is <br />proposed near the entrance <br />drive, as shown on the site <br />plan. Per Article 9.12 (f) the <br />maximum size of sixteen 116- <br />sq. ft. <br />Yes _ No <br />T Yes _ No <br />