Browse
Search
Agenda - 09-15-20; 8-f - City of Durham’s Teer Quarry Reservoir – Resolution of Support from Orange County for Reclassifying a Segment of the Eno River for Water Supply in Durham County
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 8-f - City of Durham’s Teer Quarry Reservoir – Resolution of Support from Orange County for Reclassifying a Segment of the Eno River for Water Supply in Durham County
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 4:03:11 PM
Creation date
9/10/2020 3:33:38 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
RES-2020-056 Resolution of Support for Reclassifying a Segment of the Eno River for Water Supply in Durham County, North Carolina
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> 1. Low density projects—30 feet <br /> 2. High density projects—100 feet <br /> 3. Projects covered under the 10/70 option—100 feet <br /> Figure 1.Teer Quarry,Eno River Intakes,and Protected Watershed Areas <br /> l� <br /> I 14 �y <br /> • O o <br /> 185 �• �'�� ss�f <br /> ( US70 t B <br /> a <br /> ! , •. Fsr:HS�x�.Gam"s.012c t—t`dap connitu ra r, :1 the GIS user Co.anity <br /> Legend <br /> Intake Location I Water Supply Watershed-Proposed Intake <br /> —Major Road O Critical Area-Proposed Intake Eno River Raw Water Intake near Teer Quarry <br /> Road Water Supply Watershed-Existing Intake -sue" Durham,North Carolina <br /> 0 County Boundary Critical Area-Existing Intake <br /> 0 Municipal Boundary NPDES Discharge <br /> Waterbody <br /> Attached is a brief memorandum summarizing the difference in development requirements that would result <br /> from a westward extension of the L-ENO-PW protected area in Orange County. Your own analysis would likely <br /> be more accurate. <br /> Once the City has obtained resolutions of support for the Eno River water supply classification from all of the <br /> affected jurisdictions (Town of Hillsborough, Orange County, Durham County, and City of Durham), we would <br /> submit an application for the Eno River water supply classification to the NC Department of Environmental <br /> Quality Division of Water Resources (DWR). This process will take at least 18 months according to the <br /> description from DWR (attached). <br /> The City of Durham has water distribution system interconnections with the Town of Hillsborough and with the <br /> 1600 Mist Lake Dr. Durham, NC 27704 I 919.560.4381 I DurhamNC.gov I Follow Us @©o© NC rhamNC <br />
The URL can be used to link to this page
Your browser does not support the video tag.