Orange County NC Website
12 <br /> Teer Quarry Project <br /> 5/7/2020 2019 2020 2021 2022 2023 2024 2025 <br /> Begin End Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 <br /> Permitting <br /> Teer Quarry Operation <br /> Hydrologic Modeling 6/1/2010 11/6/2012 <br /> Water Quality Modeling 2/18/2015 9/21/2016 <br /> Hydrologic Modeling 1/2/2018 7/2/2019 <br /> DEQ Approval of Teer Quarry Operation 5/2/2017 2/20/2019 ! <br /> Eno River Capicity Use Water Management <br /> Letters of No Objection <br /> Town of Hillsborough 8/30/2019 2/14/2020 <br /> Orange-Alamance Water System 8/30/2019 12/30/2019 <br /> Orange County 8/30/2019 3/10/2020 <br /> Resco Products,Inc.(formerly Piedmont Minerals) 8/30/2019 2/4/2020 <br /> EMC Approval 3/17/2020 7/8/2020 <br /> Teer Quarry Ground Water Remediation <br /> Phase II Remedial Investigation Work Plan 2/6/2020 <br /> Monitoring and Analysis <br /> Eno River Water Supply Reclassification <br /> Resolutions of Support <br /> City of Durham 3/14/2019 4/20/2020 <br /> Durham County 3/14/2019 4/27/2020 <br /> Town of Hillsborough 12/7/2018 3/9/2020 <br /> Orange County 12/7/2018 9/1/2020 <br /> Water Supply Reclassification Request 9/7/2020 3/1/2022 <br /> DWR Data Collection&Analysis <br /> EMC Approval <br /> Teer Quarry Water Supply Reclassification <br /> Water Supply Reclassification Request 9/7/2020 3/1/2022 <br /> DWR Data Collection&Analysis <br /> EMC Approval <br /> Preliminary Engineering <br /> RFC,Selection,Contracting <br /> PER <br /> Design and Permitting <br /> RFQ,Selection,Contracting <br /> Facility Permitting <br /> Quarry Berm Design <br /> Eno River Intake and Pump Station Design <br /> Raw Water Line-In Design <br /> Teer Quarry Intake and Pump Station Design <br /> Construction <br /> Bidding,Selection,Contracting <br /> Quarry Berm Construction <br /> Eno River Intake and Pump Station Construction <br /> Raw Water Line-In Construction <br /> Teer Quarry Intake and Pump Station Construction <br />