Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
562 <br /> 4.20 Will traffic, specifically <br /> tractor-trailers, entering and <br /> exiting the proposed RTLP <br /> project be utilizing New Hope <br /> Church Road toaccess <br /> Umterstate40? <br /> No.The proposed RTLP site was <br /> originally identified for economic <br /> development due to its close <br /> proximity and easy access tn <br /> Interstate 40via Old NC86. <br /> The proposed RTLP project site is <br /> approximately 0.69 from the Old <br /> NC86and Interstate 40 <br /> interchange. <br /> The proposed RTLP project site is <br /> approximately 3.77 miles from <br /> the New Hope Church Road and <br /> Interstate 40interchange. <br /> 4'11 How do the traffic <br /> impacts resulting from the <br /> proposed RTLPKHP0-CZ <br /> compare with the traffic <br /> impacts resulting from the Flom Davis to 1-40 Canterline <br /> approved Settlers Point KHP0 (3.77 miles) <br /> - <br /> Flom Davis to 1-40 Canterline <br /> CZ? at Old NC 85(0.69 miles) <br /> Based on land uses and square <br /> footage of the two proposals,the <br /> proposed RTLP IVIPD'[Zvvi|| <br /> generate less daily trips (3,648 estimated daily trips)than the approved Settlers Point IVIPD'CZ(13,635 <br /> estimated daily trips). Settler's Point was estimated to have 3.5 times the amount of traffic impact as <br /> RTLP is proposed to have. <br /> The proposed RTLP development is comprised of 2.25 million square feet of warehouse with a total daily <br /> trip t estimatedt be 3648 vehicles. The table below from the RTLPT|A <br /> Size AM Peak Hour Trips PM Peak Hour rips <br /> Land Use (SF) Daily Trips Total Enter Exit Total Enter Exit <br /> By comparison,Settler's Point consisted of 900,000 square feet of warehousing, 50,000 square feet of <br /> general office, a ZUU'room hotel, a S8,8OO square foot shopping center and a few different restaurants <br /> ranging from 5,UUU-8,000 square feet insize. |t had an estimated daily trip count of12,635vehicles. <br /> The table below comes from the Settler's Point T|A. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.