Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
556 <br /> Settlers Point(Approved) RTLP(Proposed) EDH-S Zoning <br /> Erosion Control County standards (Section 6.15) County standards (Section 6.15) Compliance with UDO <br /> required <br /> 100 ft. building setback and 50 <br /> Perimeter <br /> ft. parking lot/access road <br /> Setbacks (external 100 ft. (non EDD zoned setback(western/southern <br /> (structures) to property) property line) N/A' <br /> project) 50 ft. setback(eastern property <br /> line) <br /> External 50 ft. 25 ft. (Service Drive) N/A <br /> Road 100 ft. (Davis Road) <br /> Setbacks Front 25 ft. (internal roads) Not specified 50 ft. <br /> Side 25 ft. Not specified 20 ft. <br /> Rear 25 ft. Not specified 40 ft. <br /> -50 ft. buffer along western and <br /> - 100 ft. perimeter buffer southern property lines ft. perimeter buffer <br /> for a <br /> -50 ft. buffer along Old NC -25 ft. buffer along eastern for adjacent properties <br /> Highway 86 property line not zoned EDD <br /> Land Use Buffers -Buffers based on land <br /> -25 ft. buffer along Service Road -25 ft. buffer along Service Road <br /> -30%of a buildings perimeter and Davis Road use, range from 20 ft. to <br /> shall be landscaped -20%of a buildings perimeter ig (Interstate <br /> H <br /> shall be landscaped ighway—MTC buffer) <br /> Parking based on land <br /> use—range would <br /> require: <br /> - Retail and Office: 1 <br /> space for every 200 sq. <br /> Overall parking standard: 1 Overall parking standard: 1 ft. gross floor area; <br /> Parking space for every 300 sq. ft. of space per 750 sq. ft. of office - Manufacturing: 1 <br /> building area space and 1 space per 3,000 sq. space per employee on <br /> ft. of additional indoor area largest shift; <br /> - Delivery Service: 1 <br /> space for every <br /> employee on max shift <br /> plus 1 space per 800 sq. <br /> ft. of gross floor area <br /> Major Transportation Project would comply with Applicant indicates project will A break in the MTC <br /> Corridor(MTC) Overlay Section 6.6.4(A) (5),which comply with Section 6.6.4(A) buffer is permitted <br /> District (requires 100 ft. allows for a 50% break in the (5),which allows for a 50% consistent with Section <br /> buffer along the required buffer along the break in the required buffer 6.6.4(A) (5) of the UDO <br /> Interstate) Interstate frontage along the Interstate frontage <br /> 1:This included property east of Old NC Highway 86 in what was District 2.2: Per the Article 10 Definitions of the UDO,the open space ration area includes:parking and <br /> vehicular access areas and it can also include balconies,and roofs improved for recreation 3:Per Section 6.8.12(C)of the LIDO,a 100 ft.vegetative buffer is required to be <br /> provided at the boundary of all Economic Development Districts(EDDs). <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.