Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
555 <br /> indicated a willingness to take a lead in extending the necessary utilities to serve the project consistent <br /> with County and Town agreements. Their request, however, only involves two of the parcels that were <br /> part of the MPD-CZ for Settlers Point as approved by the County in 2018. <br /> The request currently under review does not involve the eight parcels east of Old NC Highway 86 zoned <br /> MPD-CZ (i.e. District 2 of Settlers Point). Staff has assumed responsibility for addressing the zoning of <br /> these parcels. This proposal was reviewed at the Planning Board's August 5, 2020 meeting where the <br /> Board voted unanimously to recommend approval to the Board of County Commissioners (BOCC). <br /> If the current MPD-CZ application (i.e. RTLP) is not approved,development can move forward consistent <br /> with the existing MPD-CZ (i.e. Settlers Point). If the current application under review is approved,the <br /> previous proposal approved in 2018 (i.e.the Settlers Point MPD-CZ) is simply rescinded. <br /> 2.5 How does the RTLP project compare with the previously approved Settlers Point MPD-CZ? <br /> The following chart compares and contrasts the proposed RTLP MPD-CZ with the Settlers Point MPD-CZ, <br /> approved in January 2018. In addition,the chart compares the Settlers Point MPD-CZ and the proposed <br /> RTLP MPD-CZ with the initial zoning of the site, Economic Development Hillsborough Research and <br /> Manufacturing (EDH-5) District. <br /> Settlers Point(Approved) RTLP(Proposed) EDH-S Zoning <br /> 195 acres (8,494,200 sq.ft.) as <br /> follows: 161 acres (7,013,160 sq. ft.) of <br /> Project Size N/A <br /> - District 1: 149 acres W-) property <br /> - District 2: 46 acres W-) <br /> - District 1: 1,248,000 sq.ft. of <br /> Floor Area Ratio (FAR)— building area—roughly 8,375 sq. 2,250,000 sq. ft. of building area 0.65 or 28,314 sq.ft. of <br /> the maximum floor area ft. of floor area per acre proposed—roughly 14,000 sq. floor area per acre of <br /> permitted for each - District 2: 261,800 sq. ft. of ft. of floor area per acre property <br /> square foot of land area building area—roughly 5,700 sq. <br /> ft. of floor area per acre <br /> Minimum Open Space <br /> Minimum Required Open o 1 o Ratio of 0.40 or 17,424 <br /> Space 81.6 acres (30% of project) 41 acres (25/0 of project) sq.ft. of open space <br /> area per acre of <br /> property2 <br /> Minimum Required Pedestrian paths developed Pedestrian paths developed 0.05 or 2,178 sq. ft. of <br /> Pedestrian/Landscape throughout the project— throughout the project— pedestrian access <br /> Ratio <br /> required landscaping part of required landscaping part of and/or landscaped area <br /> open space open space per acre of property <br /> 40 ft. (additional height <br /> Maximum Allowable 60 ft. 11 60 ft. allowed with increased <br /> Height front and side yard <br /> setbacks—up to 60 ft.) <br /> Project approval indicated Applicant indicates Project will <br /> compliance with applicable comply with applicably County <br /> Stormwater County standards detailed in standards detailed in Section Compliance with UDO <br /> Section 6.14 of the LIDO. This 6.14 of the UDO. This would required <br /> would include compliance with include compliance with <br /> nutrient reduction standards nutrient reduction standards <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.