Orange County NC Website
548 <br /> 5.4 Is the proposed RTLP project site located in a protected watershed?...........................................15 <br /> 5.5 What floodplain and stream protection standards will the proposed RTLP project be required to <br /> meet?................................................................................................................................................15 <br /> 5.6 Will the proposed RTLP project have to comply with County floodplain management and <br /> floodplain buffer requirements?........................................................................................................15 <br /> 5.7 What erosion control and stormwater standards are being proposed for the RTLP project? ........15 <br /> 5.8 Does Orange County have any regulations pertaining to air pollution?.........................................16 <br /> 5.9 Was an Environmental Assessment completed for this the proposed RTLP MPD-CZ? If so,what <br /> were the preliminary findings?..........................................................................................................16 <br /> 6. Performance Standards (i.e. noise, lighting, landscaping)....................................................16 <br /> 6.1 Does Orange County regulate noise?...........................................................................................16 <br /> 6.2 Does Orange County regulate noise resulting from traffic,specifically commercial trucks? ..........16 <br /> 6.3 Does Orange County regulate outdoor lighting?...........................................................................17 <br /> 6.4 Will the proposed RTLP project be required to provide landscaping and buffering?.....................17 <br /> 7. Utility Infrastructure.............................................................................................................17 <br /> 7.1 Is there adequate infrastructure (i.e. public water and sewer) available for the proposed RTLP <br /> project?.............................................................................................................................................17 <br /> 7.2 How much water and sewer is planned for the project and is there adequate capacity?..............18 <br /> 8. Economic Benefits ................................................................................................................20 <br /> 8.1 What is the proposed economic value of Research Triangle Logistics Park?..................................20 <br /> 8.2 What are the types of jobs and salaries that could occur at this location?....................................20 <br /> 8.3 Can established business parks located in the City of Mebane/Alamance County provide a real- <br /> world example of potential tenants and any positive economic impact they generate for their <br /> community?......................................................................................................................................20 <br /> 8.4 Are there examples of other distribution and fulfilment center projects that have recently moved <br /> to the region, and which represent potential future tenants for the RTLP?........................................21 <br /> 8.5 What are examples of Orange County's recent economic development projects?........................22 <br /> 8.6 Who are the major taxpayers supporting Orange County's property tax base and why is <br /> commercial development important?................................................................................................23 <br /> 8.7 What has the COVID-19 pandemic's impact been on Orange County's economy?........................23 <br /> 8.8 What official Orange County actions have occurred to promote development of the Hillsborough <br /> Economic Development District?.......................................................................................................24 <br /> 8.9 What is Orange County's priority and direction concerning the importance of balanced economic <br /> development?...................................................................................................................................24 <br /> 8.10 What Economic Development groups have endorsed the Research Triangle Logistics Park?.......24 <br /> 8.11 What is the commuting pattern of Orange County's residents with respect to employment <br /> opportunities and how does that relate to the Research Triangle Logistics Park as an employment <br /> center?..............................................................................................................................................24 <br /> 8.12 What is the current tax value and annual revenue to the County on the sites currently under <br /> option by RTLP? (Information provided by the Orange County Tax Office) .........................................25 <br /> 8.13 What is an estimate of the potential revenue stream to the County if RTLP's proposed $150 <br /> million investment was built? (Information provided by the Orange County Tax Office).....................25 <br />