Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
540 <br /> ii. Final location/size shall be reviewed/approved by staff as part of a <br /> site plan submitted in accordance with Section 2.5 of the UDO and <br /> the conditions contained herein. <br /> g. Lighting: <br /> i. Lighting plans shall be prepared in accordance with Section 6.11 of <br /> the UDO; <br /> ii. All lighting shall be full-cut off fixtures; <br /> iii. Lighting in parking areas shall observe a height limit of 45 ft.; <br /> iv. All lighting shall comply with maximum foot-candle limits at property <br /> lines as noted in Section 6.11.6.A of the UDO; <br /> v. Lighting within the Project shall abide by the standards detailed in <br /> Section 6.11.8 of the UDO. <br /> h. Stream Buffers: The Project shall comply with the provisions of Section <br /> 6.13 of the UDO. <br /> STAFF COMMENT: The applicant had inquired about reducing <br /> required stream/floodplain buffers to a minimum standard of 50 ft.. <br /> This was suggested as a way of allowing for a perimeter buffer of <br /> 100 ft. as requested by staff. <br /> At this time, staff has not made a determination on this request but <br /> believes it warrants discussion. <br /> Staff requests review of the item/concern with the applicant and <br /> BOCC members in order to fashion final condition language that is <br /> mutually agreeable to all parties. <br /> i. Stormwater regulations: The Project shall comply with the provisions of <br /> Section 6.14 of the LIDO. <br /> j. Erosion Control regulations. The Project shall comply with the <br /> provisions of Section 6.15 of the UDO <br /> k. Flood regulations: The Project shall comply with the provisions of <br /> Section 6.21 of the LIDO. <br /> VI. PERMITTED AND PROHIBITED LAND USES: <br /> STAFF COMMENT: There is no concern over the proposed land <br /> uses, most of which would be permitted under the County's general <br /> use zoning designation for the property (i.e. EDH-4 or EDH-5) and <br /> were permitted under the current MPD-CZ (Settlers Point). <br /> Staff has expressed reservations with respect to the format of how <br /> permitted/prohibited land uses are listed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.