Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT 471 <br /> 610 Michael Harvey: Chair Blankfard, if I could interject quickly. I'm sorry I know that Ms. Poole lost her internet access if <br /> 611 1 recall what Perdita said. One of her concerns was more specificity in land uses. In terms of what would fall into this <br /> 612 categories and what would not. At least that's what I have in my notes. <br /> 613 <br /> 614 Hunter Spitzer: If I may say one more thing, particularly to the residents that are listening. A lot of what we've been <br /> 615 doing over the past hour has been talking about conditions that we would like to request from the developer, that's <br /> 616 the nice part about this master planning conditional zoning is that we can ask for certain conditions to be met and so <br /> 617 if you all and I understand that you are all very opposed to this but in the off chance that it can't be stopped, you do <br /> 618 have the opportunity to shape this development through this process and so I encourage you to consider what you <br /> 619 might want to put in as conditions if at all possible. <br /> 620 <br /> 621 David Blankfard: I have a huge concern about the traffic being dumped onto Davis Drive. Not just some of the traffic <br /> 622 but everything is going to be dumped onto Davis Drive because NCDOT does not want anybody to come out the <br /> 623 service road. So I don't know if anybody else feels that way or if we want to see if the applicant can come up with a <br /> 624 better way of getting access to the site. Are we comfortable making a decision now or wanting to wait? <br /> 625 <br /> 626 Hunter Spitzer: I move that we delay a decision on our recommendation until our next meeting on September 2nd <br /> 627 <br /> 628 Michael Birch: This is Michael Birch, the applicant, I think the outstanding issues that appear to be out there are one <br /> 629 responses from DOT but I want to reiterate that whatever DOT comes back with in terms of requested improvements, <br /> 630 those will be made. So it's not really a negation in that respect. Second with regard to some of the comments about <br /> 631 Davis Drive, I just think it is not possible for us to prohibit access onto Davis Drive. Third,with regard to some of the <br /> 632 comments or requests for the conditions the design of the buildings with intent to accommodate solar, providing <br /> 633 some electric vehicle charging stations and no fuel storage adjacent to the flood plain. I am comfortable with we can <br /> 634 craft those conditions and extremely short order and so I would respectfully ask but because of the date of the next <br /> 635 Planning Board meeting being on the 2nd essentially eliminates our opportunity to get to the Board of Commissioner's <br /> 636 meeting on the 15th. I would ask that the Planning Board please consider meeting or adjourning to a date certain <br /> 637 possibly 2 weeks from today on the 19th. <br /> 638 <br /> 639 David Blankfard: I think we could do the 19th to reconvene. <br /> 640 <br /> 641 Adam Beeman: I was going to ask Craig or Michael Harvey, with what Mr. Birch said about whatever DOT comes <br /> 642 back and they're going to rectify whatever DOT says they need to do. Do you guys feel comfortable with moving <br /> 643 forward knowing whatever DOT may say or would it be better to meet a date later once the DOT issues have been <br /> 644 straightened out? <br /> 645 <br /> 646 Craig Benedict: Let me just give a brief introduction about NCDOT is in charge of the roads within Orange County so <br /> 647 they are the ultimate authority on what improvements are made because counties in North Carolina are not in the <br /> 648 road business so they take, their recommendations are of prime importance and as the developer said they will have <br /> 649 to do whatever NCDOT says. We work with DOT and we will take the comments that we have from tonight and <br /> 650 impart them to NCDOT for any alternatives that there may be but NCDOT is also in the business to use taxpayer <br /> 651 money to use the roadways to their best ability. My opinion if you want to call it that is that we will be satisfied with <br /> 652 what NCDOT suggest as improvements for the project. <br /> 653 <br /> 654 Kim Piracci: I just want to say that it seems to me that the traffic that's being talked about, even if it could be <br /> 655 arranged in such a way that the traffic only comes and goes from 40 to Old 86 and never hits Davis it just seems like <br /> 656 an enormous amount of traffic even just for Old 86. Even though I understand there'll be road expansion and <br /> 657 whatnot so I just, I feel like the scope of the project is just too big for this space in Orange County. Maybe smaller <br /> 658 warehouses or two instead of three. I don't know but in any case it just seems like too much. To me it seems all <br /> 659 that's too much. <br /> 660 <br /> 661 Hunter Spitzer: Do you have an expected return date from NCDOT on those comments?An anticipated time? <br /> 662 <br /> 663 Michael Harvey: Hunter, let me jump in and Mr. Birch may be able to also provide some detail. I don't know if it's fair <br /> 664 to say if we have any expectation from DOT. They obviously took a prolonged period of time to get us the comment <br /> 665 they got us on Friday and we can obviously impress to Mr. Edwards who is our district engineer the need for <br />
The URL can be used to link to this page
Your browser does not support the video tag.