Browse
Search
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 09-15-20 Virtual Business Meeting
>
Agenda - 09-15-20; 5-a - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for the Research Triangle Logistics Park (RTLP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:55:41 PM
Creation date
9/10/2020 3:33:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda 09-15-20 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 09-15-20 Virtual Business Meeting
Minutes 09-15-2020 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Minutes 09-22-2020 Continued Virtual Business Meeting from 9/15/2020
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
575
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47 <br /> a. The developer shall adhere to the proper disposal methodology for solid waste <br /> management. <br /> b. The applicant shall provide external space for collection of solid waste and recyclable <br /> materials. Materials collected shall be at least equivalent to the services provided by <br /> Orange County Solid Waste. <br /> C. Waste collection areas shall be located in such a manner as to provide convenient <br /> access for users of the facility and safe passage for service vehicles. <br /> d. The developer shall be required to place the following additional notes on any approved <br /> site plan: <br /> i. Any gate design will include gate retainers. <br /> ii. If any vehicles are parked in the refuse or recyclables collection vehicle access <br /> area,the containers will not receive service until the next scheduled collection day. <br /> iii. Orange County will not be responsible for any pavement damage that may result <br /> from service vehicles. <br /> iv. By Orange County Ordinance, clean wood waste, scrap metal and corrugated <br /> cardboard, all present in construction waste, must be recycled. <br /> V. By Orange County Ordinance, all haulers of construction waste must be properly <br /> licensed. <br /> e. In cases where waste collection areas are located across property lines or district lines <br /> for shared areas,the developer shall prepare and record a joint access agreement (and <br /> a shared dumpster agreement) to assure that (both parties may use) the proposed <br /> trash/recycling area and that it can be serviced across property lines. <br /> f. The developer shall reserve space within all solid waste collection areas for segregated <br /> grease rendering/recycling collection facilities and shall provide space for segregated <br /> food waste collection near the delivery entrance for any building that houses, proposes <br /> to include,or may at some future date incorporate a restaurant, cafeteria, bar,or other <br /> food service facility at any time. <br /> g. All solid waste containers, dumpsters, recycling bins, etc. shall be located within an <br /> enclosure, buffered in accordance with the standards contained herein, and meeting <br /> the following criteria: <br /> i. Loading areas shall be designed and situated not to negatively affect adjacent <br /> properties. <br /> ii. Solid waste enclosures shall be so located as to not impact internal traffic flow, <br /> iii. Loading zones shall not be located within areas designated as housing for solid <br /> waste facilities. <br /> 7. EROSION CONTROL.The development will comply with the NC Sedimentation and Pollution <br /> Control Act of 1973 and the North Carolina Administrative Code Title 15A Chapter 4. <br /> 8. STORMWATER MANAGEMENT. The following standards shall be observed with respect to <br />
The URL can be used to link to this page
Your browser does not support the video tag.